Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps I Se Mi Circle Boiler Maintenance Division Specification No 305 25 26
|
| Description |
Tangedco Nctps I 3x210 Mw Installation Of Semi Dry Flue Gas Desulphurization System
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2026_EB_671460_1 |
|
Reference Number |
CE SE MI NCTPS I 305 25 26 |
| Tender Fee | 0 |
| EMD | 3.28 Crore |
| Tender Value | - |
| Place | Works |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=806986 |
| Start Date | March 06, 2026 23:55 |
| End Date |
Expired
06/04/2026
Expired 145 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
No.03(4th call)/se/ic/kmr/2026-27, dt:23-04-2026 advilingal dam-mi in division no: telangana-superintending engineer, irrigation circle,kamareddy.
No.03(4th call)/se/ic/kmr/2026-27, dt:23-04-2026 advilingal dam-mi in division no: telangana-superintending engineer, irrigation circle,kamareddy.
Read moreNctps i se mi circle boiler maintenance division annual overhaulwork for the year 25 26 specification no 57 25 26
Nctps i se mi circle aoh 25 26 bm unit i complete removal of worn out damaged insulation in boiler drum down comer pipe line 6 nos ring header areas during annual overhaul long shutdown and relaying of insulation while unit in service
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 26 25 26
Nctps i se mi circle aoh 25 26 bm dn unit i boiler flue gas duct b pass removal of existing insulation in the flue gas duct during overhaul to facilitate for modular replacement if flue gas duct and relaying the insulation
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 201 25 26
Nctps i se mi circle aoh 25 26 bm dn unit iii rectification of damaged sagged radiant roof tubes by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing sheet
Read moreNctps i se mi circle boiler maintenance division repair maintenance work for the year 25 26 specification no 198 25 26
Nctps i semi circle r m 25 26 bm dn unit ii overhauling of water wall soot blower module by replacing worn-out spares and bring back into service.
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 200 25 26
Nctps i se mi circle aoh 25 26 bm dn unit iii reconditioning of defective coal nozzles coal tip and hard facing of reconditioned coal nozzle coal tips for boiler burner overhauling works for the year 2025 26
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 229 25 26
Nctps i se mi circle aoh 25 26 bm dn unit ii renewal of long term overheated hrh coil 9 nos 33 to 41 during annual overhaul for the year 2025 26
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 227 25 26
Nctps i se mi circle aoh 25 26 bm dn unit ii overhaul of esp 2 streams during annual overhaul for the year 2025 26
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 228 25 26
Nctps i se mi circle aoh 25 26 bm dn unit ii rectification of damaged sagged radiant roof tubs by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 225 25 26
Nctps i se mi circle aoh 25 26 bm dn unit ii annual overhaul of air pre heater a pass and its lube oil system during the year 2025 26
Read moreof your Industry type