Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development Operation And Maintenance Of Ropeway From Govind Ghat Ghangaria Hemkund Sahib In The State Of Uttarakhand On Hybrid Annuity Mode
|
| Description |
Development Operation And Maintenance Of Ropeway From Govind Ghat Ghangaria Hemkund Sahib In The State Of Uttarakhand On Hybrid Annuity Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_171694_1 |
|
Reference Number |
- |
| Tender Fee | 1 Lakh |
| EMD | 18.84 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=188051 |
| Start Date | October 20, 2023 23:30 |
| End Date |
Expired
30/01/2024
Expired 989 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Independent engineer services for development of the ropeway system from govindghat to hemkund sahib ji in the state of uttarakhand on dbfot mode.
Independent engineer services for development of the ropeway system from govindghat to hemkund sahib ji in the state of uttarakhand on dbfot mode.
Read moreConsultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreUpgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Read moreConstruction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Construction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Read moreIe services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Ie services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreConsultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Consultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Read moreIndependent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type