Tender Details

Particulars Details
Title
Set Of U Drill Of Dia 20 Mm And L/D: 4 With Tolerance Of H8 Co Nsisting Of Following: (1) . Dril L 8
Description
Organisation Department of Defence Production | Ministry of Defence
Tender Id GEM/2025/B/5775894
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date January 02, 2025 20:26
End Date

13/01/2025 ( Expired 159 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information:
Buyer Details
Name: ***********
Address: *********** THANE
Ministry: Ministry Of Defence
Department: Department Of Defence Production
Organisation: Armoured Vehicles Nigam Limited
Office Address: ***********
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.

Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.

Read more
Providing laying and jointing 05 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 48 file no. 11/25x9/1

Providing laying and jointing 05 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 48 file no. 11/25x9/1

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Repair maintenance of dg set with central panel and other connected items at zone 5 1 a b c zone 13 a b zone 2 zone 4 under ge south tezpur

Repair maintenance of dg set with central panel and other connected items at zone 5 1 a b c zone 13 a b zone 2 zone 4 under ge south tezpur&#x0d

Read more
Hiring the services of 1 number brand new ambulance with ac force trax cruiser ambulance 5 plus d plus p seater capacity 2wd diesel driven bs vi model or equivalent for a period of 4 years under medical section at ps8 sonapur oil india limited west bengal w e f 01 09 2025

Hiring the services of 1 number brand new ambulance with ac force trax cruiser ambulance 5 plus d plus p seater capacity 2wd diesel driven bs vi model or equivalent for a period of 4 years under medical section at ps8 sonapur oil india limited west bengal w e f 01 09 2025

Read more
Rejuvenation of various existing nallahs and waterways in ward no. 1, 2, 3, 4, 5, 6, 7 and 8 of mapusa municipal council in mapusa constituency.

Rejuvenation of various existing nallahs and waterways in ward no. 1, 2, 3, 4, 5, 6, 7 and 8 of mapusa municipal council in mapusa constituency.

Read more
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in bisalpur npp

Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise