Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of Lt Poles With Wire At Ward No 6 And 7 At Chountwaliwar A
|
| Description |
Installation Of Lt Poles With Wire At Ward No 6 And 7 At Chountwaliwar A
|
| Organisation | DC-PDD | State Govt. and UT |
| Tender Id | 2024_PDD_261234_1 |
|
Reference Number |
EDG/V/086 OF 2024-25 |
| Tender Fee | 200 |
| EMD | 7500 |
| Tender Value | |
| Place | GANDERBAL |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=785003 |
| Start Date | October 19, 2024 21:30 |
| End Date |
Expired
07/11/2024
Expired 574 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconductoring of lt oh line with lt abc at valiyaparambu tfr area under es panangad
Stringing lt abc, dismantling existing line, insertion of poles and allied works
Read moreComprehensive repair maint of lt oh lines lt panels ug cables poles and connected works under ge 859 ews
Comprehensive repair maint of lt oh lines lt panels ug cables poles and connected works under ge 859 ews
Read moreProviding of lt poles for smart metering including replacement of old wooden poles (metering) at sub-division pulwama, newa and rajpora under ut capex 2026-27
Providing of lt poles for smart metering including replacement of old wooden poles (metering) at sub-division pulwama, newa and rajpora under ut capex 2026-27
Read moreInstallation of 7 no additional distribution transformer under edd rasara.
Installation of 7 no additional distribution transformer under edd rasara. &#x0d
Read moreProviding and fixing of 4 meter fancy poles in library park ward no. 19 mc, panipat recall.
Providing and fixing of 4 meter fancy poles in library park ward no. 19 mc, panipat recall.
Read moreSupply, installation, testing and commissioning of lt control panel at 12 mld wtp opa.
Supply, installation, testing and commissioning of lt control panel at 12 mld wtp opa.
Read moreReplacements of bare conductor with lt ab cable and strengthening of lt line under edd nautanwa
Replacements of bare conductor with lt ab cable and strengthening of lt line under edd nautanwa
Read moreReplacements of bare conductor with lt ab cable and strengthening of lt line under edd nichlaul
Replacements of bare conductor with lt ab cable and strengthening of lt line under edd nichlaul
Read moreConstruction work of c.c. road at ward 55 kushwah gali, ward no. 55. file no. 272/26x3/6.
Construction work of c.c. road at ward 55 kushwah gali, ward no. 55. file no. 272/26x3/6.
Read more(molik nidhi) construction of cc and drain work at different places at zone no.05 ward no.16.file no.259/26x3/6.
(molik nidhi) construction of cc and drain work at different places at zone no.05 ward no.16.file no.259/26x3/6.
Read moreof your Industry type