Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
C/O Balance Work For Foot Bridge On Nallah Daksum At Gorankhal Desuu A Block Larnoo
|
Description |
C/O Balance Work For Foot Bridge On Nallah Daksum At Gorankhal Desuu A Block Larnoo
|
Organisation | Government of Jammu and Kashmir |
Tender Id | 2023_RDPR_225868_5 |
Reference Number |
ENIT106OF2023-24 |
Tender Fee | 600 |
EMD | 35730 |
Tender Value | |
Place | OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG |
Link | https://jktenders.gov.in |
Start Date | August 10, 2023 23:30 |
End Date |
17/08/2023 ( Expired 673 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Construction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Read moreConst. of foot bridge (240 mtrs) over river jehlum at tundpora hakbara (near mini secretariat sumbal on epc mode (engineering procurement and construction mode).
Const. of foot bridge (240 mtrs) over river jehlum at tundpora hakbara (near mini secretariat sumbal on epc mode (engineering procurement and construction mode).
Read moreConstruction of 180 mtrspan bridge at bhatti nallah at rd 106.530 on nh154a in the state of himachal pradesh.
Construction of 180 mtrspan bridge at bhatti nallah at rd 106.530 on nh154a in the state of himachal pradesh.
Read moreRepair/maint including periodic testing of earthing infra at various danger buildings, repair/maint including replacement of electric lt switchgears and panels in wsa area and work services for periodic cleaning of overheads tanks including testing o
Repair/maint including periodic testing of earthing infra at various danger buildings, repair/maint including replacement of electric lt switchgears and panels in wsa area and work services for periodic cleaning of overheads tanks including testing o
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreAAAAAAAAAA
Login to viewSinking of 01 no. 250x150mm dia. 360 m. deep replacement tubewell by d.r rig method using upvc pipe and pre-packed resin bonded gravel filter at head work site for augmentation of koaberia w/s scheme, block-kakdwip under kakdwip sub-divn., phe dte.
Read moreof your Industry type