Tender Details

Particulars Details
Title
Construction Of New 4 Lane Coastal Road With Paved Shoulder From Puri To Kakatpur (Km.47.050 To Km.91.600) On Hybrid Annuity Mode In The State Of Odisha (Package Ii).
Description
Construction Of New 4 Lane Coastal Road With Paved Shoulder From Puri To Kakatpur (Km.47.050 To Km.91.600) On Hybrid Annuity Mode In The State Of Odisha (Package Ii).
Organisation Central Public Procurement Portal 2
Tender Id 2022_NHAI_132542_1
Reference
Number
NHAI/OD/CR/ RK/PKG-II/efile-171625
Tender Fee 1.3 Lakh
EMD 12.98 Crore
Tender Value -
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in

Start Date October 18, 2022 20:40
End Date
Expired 27/07/2023

Expired 1175 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).

Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).

Read more
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).

Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).

Read more
Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)

Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)

Read more
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.

Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode

Upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode

Read more
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Read more
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)

Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise