Tender Details

Particulars Details
Title
Repairing And Overhauling Of Rewinding Of Electric Motor 150 Hp 550 V
Description
For The Repairing And Overhauling Of Rewinding Of Electric Motor 150 Hp 550 V Make Mn P Sl.No.6834/015 At Sb Workshop Under Sijua Area.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 1752
Tender Value
Place SBC W/Shop under Sijua Area
Link

AAAAAAAAAA

Login to view
Start Date June 03, 2025 22:30
End Date

12/06/2025 ( 7 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project

Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep

Read more
Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.

Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.

Read more
Overhauling of electrical and pneumatic actuators, sadc system, swas system,turbovisory equipments ,hp/lp bypass ,dozing system, flame scanners, igniters, solenoid valves, hot air gate, pneumatic damper/ power cylinder, hydra stepsvibration monitorin

Overhauling of electrical and pneumatic actuators, sadc system, swas system,turbovisoryequipments ,hp/lp bypass ,dozing system, flame scanners, igniters, solenoid valves, hot air gate, pneumatic damper/ power cylinder, hydra steps vibration monitori

Read more
Overhauling of bfp and its booster pump of unit # 3 of 3x210mw,atps,anpara

Overhauling of bfp and its booster pump of unit # 3 of 3x210mw,atps,anpara

Read more
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.

Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.

Read more
Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara

Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara

Read more
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Read more
Round the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/

Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise