Tender Details

Particulars Details
Title
Replacement Of Worn Out And Damaged Tail And Tail Snub Pulley Along With Tail Frame (Non Drive) Arrangement Of Unit No. 303 Belt Conveyor And Making Of 02 Nos. Frame Stand For Belting System Of Main Plant At Kedla Washery.
Description
Replacement Of Worn Out And Damaged Tail And Tail Snub Pulley Along With Tail Frame (Non Drive) Arrangement Of Unit No. 303 Belt Conveyor And Making Of 02 Nos. Frame Stand For Belting System Of Main Plant At Kedla Washery.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_318278_1
Reference
Number
PO/KW/E-Tender/24-25/41, Dated-27.09.2024
Tender Fee 0
EMD 4300
Tender Value
Place KEDLA WASHERY
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329900

Start Date September 28, 2024 16:30
End Date
Expired 07/10/2024

Expired 631 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Replacement of damaged non-drive (tail-frame arrangement, deck plate arrangement, top, bottom idler frame tail and head, snub pulley) of unit no. 415 , 247 belt conveyor of main plant of kedla washery

Replacement of damaged non-drive (tail-frame arrangement, deck plate arrangement, top, bottom idler frame tail and head, snub pulley) of unit no. 415 , 247 belt conveyor of main plant of kedla washery

Read more
Complete repairing of 02 nos. drive pulley of diameter 1250x1150mm of unit no. 303 belt conveyor of main plant at kedla washery

Complete repairing of 02 nos. drive pulley of diameter 1250x1150mm of unit no. 303 belt conveyor of main plant at kedla washery

Read more
Replacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery

Replacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery

Read more
Replacement of 03 no. bend pulley, snub pulley, drive pulley and take-up guide frame rectification, strengthening and alignment of unit no. 303 belt conv. and replacement of damaged tail pulley, t , h snub pulley along with 15 no. carriage wheel asly

Replacement of 03 no. bend pulley, snub pulley, drive pulley and take-up guide frame rectification, strengthening and alignment of unit no. 303 belt conv. and replacement of damaged tail pulley, t , h snub pulley along with 15 no. carriage wheel asly

Read more
Rectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.

Rectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.

Read more
Complete replacement of worn-out and damaged liner plate in discharge chute of unit no. 303,304 and 307 belt conveyor of main plant at kedla washery

Complete replacement of worn-out and damaged liner plate in discharge chute of unit no. 303,304 and 307 belt conveyor of main plant at kedla washery

Read more
Complete repairing of 02 nos. non-drive pulley (dia 630x1400mm) of main plant at kedla washery

Complete repairing of 02 nos. non-drive pulley (dia 630x1400mm) of main plant at kedla washery

Read more
Replacement of tail drum and snub drum assemblies, including dismantling of existing worn-out drums, strengthening of tail drum base frame and replacement of four snub drum bearing blocks for unit 201 belt conveyor at moonidih coal washery.

Replacement of tail drum and snub drum assemblies, including dismantling of existing worn-out drums, strengthening of tail drum base frame and replacement of four snub drum bearing blocks for unit 201 belt conveyor at moonidih coal washery.

Read more
Repairing of 01 nos. bend pulley (dia 850x1150mm) of unit no. 304 belt conveyor and 01 nos. of non-drive pulley (dia 1050x1150mm) of 415 belt conveyor at main plant of kedla washery

Repairing of 01 nos. bend pulley (dia 850x1150mm) of unit no. 304 belt conveyor and 01 nos. of non-drive pulley (dia 1050x1150mm) of 415 belt conveyor at main plant of kedla washery

Read more
Replacement of damaged/ decayed overhead monorail arrangement, platform straightening and supporting of case for maintenance with safety of gear box motor, drive pulley of 303 and 304 belt conv. of main plant of kedla washery

Replacement of damaged/ decayed overhead monorail arrangement, platform straightening and supporting of case for maintenance with safety of gear box motor, drive pulley of 303 and 304 belt conv. of main plant of kedla washery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise