Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Procurement Opportunity: Replacement Of Conveyor Components At Kedla Washery 🚧 Central Coalfields Limited (Cccl), A Public Sector Undertaking, Is Seeking Bids For The Replacement Of Damaged Non Drive Components Of The 247 Belt Conveyor At Kedla Washery, Unit No. 415. 📅 Bid Submission Deadline: July 15, 2024, 11:00 Am The Scope Includes The Supply And Replacement Of The Tail Frame Arrangement, Deck Plate Arrangement, Top And Bottom Idler Frames (Tail And Head), And Snub Pulley. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 42,000. Bidders Should Possess The Necessary Technical Expertise And Experience In Handling Such Machinery Components. Comprehensive Bids Should Detail The Proposed Solutions, Pricing, And Timelines For The Project Execution. Keywords: Conveyor Components, Replacement, Kedla Washery, Central Coalfields Limited, Public Sector Undertaking, Bid, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Replacement Of Damaged Non Drive (Tail Frame Arrangement, Deck Plate Arrangement, Top, Bottom Idler Frame Tail And Head, Snub Pulley) Of Unit No. 415 , 247 Belt Conveyor Of Main Plant Of Kedla Washery
|
| Description |
Replacement Of Damaged Non Drive (Tail Frame Arrangement, Deck Plate Arrangement, Top, Bottom Idler Frame Tail And Head, Snub Pulley) Of Unit No. 415 , 247 Belt Conveyor Of Main Plant Of Kedla Washery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_311915_1 |
|
Reference Number |
PO/KW/E-Tender/24-25/02, dated 04.07.2024 |
| Tender Fee | 0 |
| EMD | 4200 |
| Tender Value | - |
| Place | Kedla Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323241 |
| Start Date | July 05, 2024 16:30 |
| End Date |
Expired
15/07/2024
Expired 780 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Complete repairing of 04 nos. snub pulleys (dia 400x1150mm) of unit no. 247, 415, 302 and 307 belt conveyors of main plant at kedla washery.
Complete repairing of 04 nos. snub pulleys (dia 400x1150mm) of unit no. 247, 415, 302 and 307 belt conveyors of main plant at kedla washery.
Read moreReplacement of worn-out and damaged tail and tail snub pulley along with tail frame (non-drive) arrangement of unit no. 303 belt conveyor and making of 02 nos. frame stand for belting system of main plant at kedla washery.
Replacement of worn-out and damaged tail and tail snub pulley along with tail frame (non-drive) arrangement of unit no. 303 belt conveyor and making of 02 nos. frame stand for belting system of main plant at kedla washery.
Read more116aandb deck plate channel repairing of pre-washery at kedla washery.
116aandb deck plate channel repairing of pre-washery at kedla washery.
Read more116 a a and b deck plate channel repairing of pre-washery at kedla washery
116 a and b deck plate channel repairing of pre-washery at kedla washery
Read moreDeck plate channel changing of 133a belt conveyor of pre-washery section at kedla washery
Deck plate channel changing of 133a belt conveyor of pre-washery section at kedla washery
Read moreRepairing of deck plate support and channel changing, dismantling and reinstallation of idler frame and rollers of belt conveyor 133 a and b of prewashery at kedla washery
Repairing of deck plate support and channel changing, dismantling and reinstallation of idler frame and rollers of belt conveyor 133 a and b of prewashery at kedla washery
Read moreReplacement of damaged decayed deck plate, channel, angle and top and bottom frame with idlers dismantling and reinstallation along with replacement of damaged tail base frame nondrive arrangement after tail snub pulley dismantling of unit no. 304
Replacement of damaged decayed deck plate, channel, angle and top and bottom frame with idlers dismantling and reinstallation along with replacement of damaged tail base frame nondrive arrangement after tail snub pulley dismantling of unit no. 304
Read moreComplete repairing of 04 nos. head drum and tail drum pulleys (dia654x1150mm) of unit no. 227 and 247 belt conveyors of main plant at kedla washery.
Complete repairing of 04 nos. head drum and tail drum pulleys (dia654x1150mm) of unit no. 227 and 247 belt conveyors of main plant at kedla washery.
Read moreReplacement of tail drum and snub drum assemblies, including dismantling of existing worn-out drums, strengthening of tail drum base frame and replacement of four snub drum bearing blocks for unit 201 belt conveyor at moonidih coal washery.
Replacement of tail drum and snub drum assemblies, including dismantling of existing worn-out drums, strengthening of tail drum base frame and replacement of four snub drum bearing blocks for unit 201 belt conveyor at moonidih coal washery.
Read moreRepairing of head drum pulley of 133a and 02 nos. bend snub drum of 116 a and b conveyor of pre washery at kedla washery.
Repairing of head drum pulley of 133a and 02 nos. bend snub drum of 116 a and b conveyor of pre washery at kedla washery.
Read moreof your Industry type