Tender Details

Particulars Details
Title
Ukai Songhad Jalgaon Section Through Sleeper Renewal (P) = 15.22 Kms And (Trr(p) 3.00 Tkm &Amp Tsr(p) 21.640 Tkm By Contractor S Pqrs Portal.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79589743
Reference
Number
BCT-24-25-266
Tender Fee 0
EMD 6.09 Lakh
Tender Value -
Place Mumbai
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79589743/viewNitPdf_4836177.pdf

Start Date January 21, 2025 18:37
End Date
Expired 14/02/2025

Expired 608 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser

Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser

Read more
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,

Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,

Read more
A)kalyan - karjat & karjat - panvel - tsr(p) - 29.635 tkm (project id no.01.02.31.26.3.51.003)b)kalyan - karjat -trr(p) - 22.784 tkm & ctr(p) - 0.997 tkm & karjat - panvel - trr(p) - 0.718 tkm & ctr(p) - 3.731 tkm. (project id no.01.02.31.26.3.51.001)c)kalyan -karjat -twr-4.900 tkm (project id no. 01.02.31.26.3.51.037)d)kjt - lnl - replacement of sej with twsej - 7 nos. & kyn - kjt - replacement of sej with twsej -18 nos.(project id no. 01.02.31.26.3.51.038)e) neral - mathe

A)kalyan - karjat & karjat - panvel - tsr(p) - 29.635 tkm (project id no.01.02.31.26.3.51.003)b)kalyan - karjat -trr(p) - 22.784 tkm & ctr(p) - 0.997 tkm & karjat - panvel - trr(p) - 0.718 tkm & ctr(p) - 3.731 tkm. (project id no.01.02.31.26.3.51.001)c)kalyan -karjat -twr-4.900 tkm (project id no. 01.02.31.26.3.51.037)d)kjt - lnl - replacement of sej with twsej - 7 nos. & kyn - kjt - replacement of sej with twsej -18 nos.(project id no. 01.02.31.26.3.51.038)e) neral - mathe

Read more
A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.

A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.

Read more
S&t work in connection with (a) bhagalpur - dumka (sl) - ctr(p) - 13.375 tkm (b) jamalpur - munger & y-leg (sl) - ctr(p) - 8.398 tkm & azimganj - new farakka (dn) - ctr(p) - 1 tkm, (c) mandar hill - hansdiha (sl) - trr(p) - 21.712 tkm, (d) bhagalpur - jamalpur (up & dn) - tsr(p) - 23.01 tkm, (e) malda division - tsr(p) - 9.585 tkm, (f) bhagalpur - kiul & bhagalpur - dumka - ttr (tws + wcmsc) - 80 sets (1 in 12 - 77 sets and 1 in 8.5 - 3 sets), (g) azimganj - new farakka - t

S&t work in connection with (a) bhagalpur - dumka (sl) - ctr(p) - 13.375 tkm (b) jamalpur - munger & y-leg (sl) - ctr(p) - 8.398 tkm & azimganj - new farakka (dn) - ctr(p) - 1 tkm, (c) mandar hill - hansdiha (sl) - trr(p) - 21.712 tkm, (d) bhagalpur - jamalpur (up & dn) - tsr(p) - 23.01 tkm, (e) malda division - tsr(p) - 9.585 tkm, (f) bhagalpur - kiul & bhagalpur - dumka - ttr (tws + wcmsc) - 80 sets (1 in 12 - 77 sets and 1 in 8.5 - 3 sets), (g) azimganj - new farakka - t

Read more
Through sleeper renewal-primary (tsr-p) by contractor s pqrs portal along with flash butt welding and other miscellaneous works in prayagraj-kanpur section under the jurisdiction of sr. divisional engineer/ii/prayagraj.

Through sleeper renewal-primary (tsr-p) by contractor s pqrs portal along with flash butt welding and other miscellaneous works in prayagraj-kanpur section under the jurisdiction of sr. divisional engineer/ii/prayagraj.

Read more
Various track works such as trr(p) = 5.517 tkm, ttr(tsr) = 37 sets (1 in 12 -36 sets & 1 in 8.5 -1 set) , ttr (fs+tws+wcmsc)= 2 sets (1 in 12) , ttr(wcmsc) = 1 set (1 in 12) & tbr(manual) = 9.866 tkm in the jurisdiction of sr. den- v/lko. (estt. no. 135-2025, 175-2026, 170-2026, 164-2026 & 176-2026)

Various track works such as trr(p) = 5.517 tkm, ttr(tsr) = 37 sets (1 in 12 -36 sets & 1 in 8.5 -1 set) , ttr (fs+tws+wcmsc)= 2 sets (1 in 12) , ttr(wcmsc) = 1 set (1 in 12) & tbr(manual) = 9.866 tkm in the jurisdiction of sr. den- v/lko. (estt. no. 135-2025, 175-2026, 170-2026, 164-2026 & 176-2026)

Read more
A.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail

A.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail

Read more
Howrah division - tsr(p) - 29.861 tkm in location -hwh - bly - up -1.365-1.965 = 0.6 km, 2.000-2.743= .743 km ,hwh-bly -up chord - 6.00-8.66 = 2.66 km ,bdc-skg - dn - 40.500-46.902 = 6.402 km ,bdc-kwae-dn-17.144-20.034 = 2.89 km ,kwae-az-dn -142.00-148.00 = 6.00 km , 150.00-153.00 = 3.00 km , kan-snt -dn -27.022-30.294 = 3.272 km , 39.063-41.914= 2.851 km ,kan-snt-up - 70.24-70.93= 0.69 km , snt-nht -up - 70.93 -71.683 = 0.753 km by contractor s own pqrsportals (2 nos.) and gan

Howrah division - tsr(p) - 29.861 tkm in location -hwh - bly - up -1.365-1.965 = 0.6 km, 2.000-2.743= .743 km ,hwh-bly -up chord - 6.00-8.66 = 2.66 km ,bdc-skg - dn - 40.500-46.902 = 6.402 km ,bdc-kwae-dn-17.144-20.034 = 2.89 km ,kwae-az-dn -142.00-148.00 = 6.00 km , 150.00-153.00 = 3.00 km , kan-snt -dn -27.022-30.294 = 3.272 km , 39.063-41.914= 2.851 km ,kan-snt-up - 70.24-70.93= 0.69 km , snt-nht -up - 70.93 -71.683 = 0.753 km by contractor s own pqrsportals (2 nos.) and gan

Read more