Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ukai Songhad Jalgaon Section Reconditioning Of Cms Crossing And Tongue Rails In Connection With Trr(p) 2.475 Tkm &Amp Tsr(p) 1.948 Tkm. And Tsr(s) 6.445 Tkm. Under The Jurisdiction Of Den/East.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72845952 |
|
Reference Number |
BCT-23-24-276 |
| Tender Fee | 0 |
| EMD | 71500 |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72845952/viewNitPdf_4439907.pdf |
| Start Date | January 23, 2024 22:04 |
| End Date |
Expired
16/02/2024
Expired 972 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.
A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.
Read moreA)kalyan - karjat & karjat - panvel - tsr(p) - 29.635 tkm (project id no.01.02.31.26.3.51.003)b)kalyan - karjat -trr(p) - 22.784 tkm & ctr(p) - 0.997 tkm & karjat - panvel - trr(p) - 0.718 tkm & ctr(p) - 3.731 tkm. (project id no.01.02.31.26.3.51.001)c)kalyan -karjat -twr-4.900 tkm (project id no. 01.02.31.26.3.51.037)d)kjt - lnl - replacement of sej with twsej - 7 nos. & kyn - kjt - replacement of sej with twsej -18 nos.(project id no. 01.02.31.26.3.51.038)e) neral - mathe
A)kalyan - karjat & karjat - panvel - tsr(p) - 29.635 tkm (project id no.01.02.31.26.3.51.003)b)kalyan - karjat -trr(p) - 22.784 tkm & ctr(p) - 0.997 tkm & karjat - panvel - trr(p) - 0.718 tkm & ctr(p) - 3.731 tkm. (project id no.01.02.31.26.3.51.001)c)kalyan -karjat -twr-4.900 tkm (project id no. 01.02.31.26.3.51.037)d)kjt - lnl - replacement of sej with twsej - 7 nos. & kyn - kjt - replacement of sej with twsej -18 nos.(project id no. 01.02.31.26.3.51.038)e) neral - mathe
Read moreS&t work in connection with (a) bhagalpur - dumka (sl) - ctr(p) - 13.375 tkm (b) jamalpur - munger & y-leg (sl) - ctr(p) - 8.398 tkm & azimganj - new farakka (dn) - ctr(p) - 1 tkm, (c) mandar hill - hansdiha (sl) - trr(p) - 21.712 tkm, (d) bhagalpur - jamalpur (up & dn) - tsr(p) - 23.01 tkm, (e) malda division - tsr(p) - 9.585 tkm, (f) bhagalpur - kiul & bhagalpur - dumka - ttr (tws + wcmsc) - 80 sets (1 in 12 - 77 sets and 1 in 8.5 - 3 sets), (g) azimganj - new farakka - t
S&t work in connection with (a) bhagalpur - dumka (sl) - ctr(p) - 13.375 tkm (b) jamalpur - munger & y-leg (sl) - ctr(p) - 8.398 tkm & azimganj - new farakka (dn) - ctr(p) - 1 tkm, (c) mandar hill - hansdiha (sl) - trr(p) - 21.712 tkm, (d) bhagalpur - jamalpur (up & dn) - tsr(p) - 23.01 tkm, (e) malda division - tsr(p) - 9.585 tkm, (f) bhagalpur - kiul & bhagalpur - dumka - ttr (tws + wcmsc) - 80 sets (1 in 12 - 77 sets and 1 in 8.5 - 3 sets), (g) azimganj - new farakka - t
Read moreTrr(p) with new 60 kg (90/110 uts/r 260/1175 ht) lwr rails including replacement of fittings= 14.023 tkm. under the section of sr. den/2/dhn.
Trr(p) with new 60 kg (90/110 uts/r 260/1175 ht) lwr rails including replacement of fittings= 14.023 tkm. under the section of sr. den/2/dhn.
Read moreVarious track works such as trr(p) = 5.517 tkm, ttr(tsr) = 37 sets (1 in 12 -36 sets & 1 in 8.5 -1 set) , ttr (fs+tws+wcmsc)= 2 sets (1 in 12) , ttr(wcmsc) = 1 set (1 in 12) & tbr(manual) = 9.866 tkm in the jurisdiction of sr. den- v/lko. (estt. no. 135-2025, 175-2026, 170-2026, 164-2026 & 176-2026)
Various track works such as trr(p) = 5.517 tkm, ttr(tsr) = 37 sets (1 in 12 -36 sets & 1 in 8.5 -1 set) , ttr (fs+tws+wcmsc)= 2 sets (1 in 12) , ttr(wcmsc) = 1 set (1 in 12) & tbr(manual) = 9.866 tkm in the jurisdiction of sr. den- v/lko. (estt. no. 135-2025, 175-2026, 170-2026, 164-2026 & 176-2026)
Read moreMs-vm section :manufacture and supply of welding portions for 52/60 kg rails for various track works in sr.den/south/mas jurisdiction. 1) ms-vm section: trr(p)-1.472 km 2) ms-vm section: tsr(p)-11.755 km 3) ms-vm section: trr (s)-3.260 km 4) ms-vm section: tsr(s)-5.334 km 5) ms-vm section: ttr-115 sets 6) ms-vm section: ttr- 87 sets 7) ms-vm section: twr-12.50 km 8) ms-vm section: renewal of sejs- 16 sets, glued joints - 4 sets & improved sej - 52kg- 6 set 9)ms-vm section: trr 10.00
Ms-vm section :manufacture and supply of welding portions for 52/60 kg rails for various track works in sr.den/south/mas jurisdiction. 1) ms-vm section: trr(p)-1.472 km 2) ms-vm section: tsr(p)-11.755 km 3) ms-vm section: trr (s)-3.260 km 4) ms-vm section: tsr(s)-5.334 km 5) ms-vm section: ttr-115 sets 6) ms-vm section: ttr- 87 sets 7) ms-vm section: twr-12.50 km 8) ms-vm section: renewal of sejs- 16 sets, glued joints - 4 sets & improved sej - 52kg- 6 set 9)ms-vm section: trr 10.00
Read moreA.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail
A.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail
Read moreUkai-songhad-jalgaon section-. reconditioning of cms crossing in connection with sanctioned track work(2023-24)trr(p) - 2.475 tkm & tsr(p) - 1.948 tkm. and tsr(s) - 6.445 tkm. under the jurisdiction of den/east.
For complete deion and other details, please refer to tender
Read moreUkai songhad - jalgaon sec.- 1) ctr(s/p)-5.068 tkm. 2) tsr(s)- 6.445 tkm & 3) trr(p) - 2.475 tkm & tsr(p) - 1.948 tkm sanctioned track work 23-24. and 4) fixing of wooden distance pieces for platforms & providing wooden blocks at rail joints. under den/e section.
For complete deion and other details, please refer to tender
Read moreUkai songhad - jalgaon sec.- 1) ctr(s/p)-5.068 tkm. 2) tsr(s)- 6.445 tkm & 3) trr(p) - 2.475 tkm & tsr(p) - 1.948 tkm sanctioned track work 23-24. and 4) fixing of wooden distance pieces for platforms & providing wooden blocks at rail joints. under den/e section.
For complete deion and other details, please refer to tender
Read moreof your Industry type