Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Tender Document For
|
| Description |
Re Tender Document For &Amp#X0d
Civil Works For Construction Of Foundation &Amp#X0d
For New Milk Silo&Amp#X0d
At&Amp#X0d
Milma Wayanad Dairy&Amp#X0d
|
| Organisation | Kerala Co-operative Milk Marketing Federation Ltd | State Govt. and UT |
| Tender Id | 2024_KCMMF_684719_1 |
|
Reference Number |
WYD/ENGG/129/WYD-SILO/2024-25 |
| Tender Fee | 1800 |
| EMD | 24000 |
| Tender Value | - |
| Place | MILMA WAYANAD DAIRY |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1078096 |
| Start Date | September 25, 2024 17:30 |
| End Date |
Expired
04/10/2024
Expired 727 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreProcurement of medical equipments for hospitals in shimoga
Procurement of medical equipments for hospitals in shimoga
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreProcurement of 9 m stepped tubular lighting poles for pkoc project,manuguru area -reg.
Procurement of 9 m stepped tubular lighting poles for pkoc project,manuguru area -reg.
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreof your Industry type