Tender Details

Particulars Details
Title
Jadcherla Municipality Infrastructure Development Works In Ul Bs With Tufi Dc Assistance Construction Of Cc Drains And Laying Of Vdcc Roads In 1 To 27 Wards Of Jadcherla Municipality
Description
Jadcherla Municipality Infrastructure Development Works In Ul Bs With Tufi Dc Assistance Construction Of Cc Drains And Laying Of Vdcc Roads In 1 To 27 Wards Of Jadcherla Municipality
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 567013
Reference
Number
59/SE/Unit III/Jadcherla/CC Roads/744.72 L/2024-25 Dt: 03-01-2025
Tender Fee 11800
EMD 5.75 Lakh
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date January 09, 2025 16:00
End Date

29/01/2025 ( Expired 139 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Redevelopment of kamathipura cluster lane 1 to 15, kamathipura, mumbai, through a construction- cum development contract by appointment of c and da

Redevelopment of kamathipura cluster lane 1 to 15, kamathipura, mumbai, through a construction- cum development contract by appointment of c and da

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Selection of epc contractor for chitrakoot link expressway

Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode

Read more
Design and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Design and construction of &#x0d property development buildings in land parcels at existing mandaveli bus &#x0d depot and terminus including civil, architectural finishes, plumbing, e and m, &#x0d hvac, lifts and all associated works

Read more
Design and construction of property development buildings near thirumangalam metro station along the viaduct in open land parcels including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Design and construction of property development buildings near thirumangalam metro station along the viaduct in open land parcels including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise