Tender Details

Particulars Details
Title
Shifting Of 11 Kv Electric Line Of Village Kunjri Submergence In Under Construction Khedapati Irrigation Project Dist Barwani.
Description
Shifting Of 11 Kv Electric Line Of Village Kunjri Submergence In Under Construction Khedapati Irrigation Project Dist Barwani.
Organisation Engineer-in-Chief - Water Resources Department | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2295
EMD 14622
Tender Value
Place Office of Executive Engineer LM and E/M Dhar
Link

AAAAAAAAAA

Login to view
Start Date June 09, 2025 16:00
End Date

16/06/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line

Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.

Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.

Read more
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi

For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of mipi-andrathang road from km 20.000 to 50.000

Construction of mipi-andrathang road from km 20.000 to 50.000&#x0d (design length 34.880 km between km 20.000 to 54.880)green field&#x0d alignment to nhsl specifications in the aor of 62 rcc under 752 brtf&#x0d of project udayak in arunachal pradesh state

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of rcc draintotal 8.06 km of nh-512 nh division vii

Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise