Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
R.R Damages On Kashdhar Darkali Road Km. 0.000 To 22.700
|
| Description |
Sh C.O Wire Crate R.Wall At Km. 5.270 To 5.295
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2026_PWD_129955_1 |
|
Reference Number |
PW/RMP/TA/2025-12978 dated 23.02.2026 |
| Tender Fee | 350 |
| EMD | 8900 |
| Tender Value | - |
| Place | EE B and R Division HPPWD Rampur |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=193124 |
| Start Date | March 06, 2026 21:30 |
| End Date |
Expired
12/03/2026
Expired 187 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreImprovement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreConstruction of road from jurgudih yatra mela dangal nh-419 main road to hisadih tola via jurgudih (1.000 km)
Construction of road from jurgudih yatra mela dangal nh-419 main road to hisadih tola via jurgudih (1.000 km)
Read moreConstruction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read moreImprovement of road at ward no 14 lali house to near nala and ward no 14 harugeri yalparatti road to nijamasab nadaf house and mugalakhod road yamanaraj rabakavi house road and kudachi road to balesh hadakar house road and construction of drainage near jambagi college to athani gokak main road under harugeri tmc limit
Improvement of road at ward no 14 lali house to near nala and ward no 14 harugeri yalparatti road to nijamasab nadaf house and mugalakhod road yamanaraj rabakavi house road and kudachi road to balesh hadakar house road and construction of drainage near jambagi college to athani gokak main road under harugeri tmc limit
Read moreUp gradation of existing 1500 kva transformers to 2500kva transformers-03 nos on buy-back basis
Up gradation of existing 1500 kva transformers to 2500kva transformers-03 nos on buy-back basis, including, supply, installation, testing, commissioning, necessary civil works, ht/lt connectivity and statutory approvals at main dairy, bengaluru on turnkey basis
Read moreRoad development work in kollegal taluk srirangapattana-malaimahadeshwara hills road state highway-79 chain from 68.70 to 69.61 kms ( dasanapura junction to n h -948 connecting road (near animal department office))
Road development work in kollegal taluk srirangapattana-malaimahadeshwara hills road state highway-79 chain from 68.70 to 69.61 kms ( dasanapura junction to n h -948 connecting road (near animal department office))
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read moreInstallation of single arm pole ward no 05 from athani gokak main road to pol plot oht from naragonda hospital to bastawada house and athani road to jamadar house under tmc limit
Installation of single arm pole ward no 05 from athani gokak main road to pol plot oht from naragonda hospital to bastawada house and athani road to jamadar house under tmc limit
Read moreof your Industry type