Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cctv System With All Accessories
|
| Description |
|
| Organisation | INDIAN OIL CORPORATION LIMITED | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2023/B/3591841 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 20, 2023 20:11 |
| End Date |
Expired
11/07/2023
Expired 1179 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ASCENT NETWORKS PRIVATE LIMITED | Make : Ascent Networks Pvt Ltd Model : ANPL MR CCTV Title : ANPL MR CCTV | 21-07-2023 14:41:15 | MII | Qualified |
| 2 | AVER SOLUTIONS AND GLOBAL SERVICES PRIVATE LIMITED | Make : Infinova Model : VP160-A244-M5 Title : Explosion-proof IR PTZ Camera | 31-07-2023 15:39:56 | N/A | Disqualified |
| 3 | LARAON ENGINEERS AND CONSULTANTS PRIVATE LTD. | Make : comRACK Model : 42U RACK Title : IT RACK | 06-07-2023 18:57:38 | MII | Qualified |
| 4 | NEOMETRIX DEFENCE LIMITED | Make : Neometrix Engineering Private Limited Model : A6342_ CCTV System with all accessories Title : CCTV System with all accessories | 11-07-2023 14:12:29 | MSE | Disqualified |
| 5 | Secure Automation Consultants | Make : Un Branded Model : cctv Title : CCTV SYSTEM WITH ALL ACCESSORIES | 31-07-2023 16:16:09 | MII | Qualified |
| 6 | TWENTY FOUR SYSTEMS PRIVATE LIMITED | Make : Twenty Four Systems Pvt Ltd Model : CCTV SYSTEM WITH ALL ACCESSORIES (Q3) Title : CCTV SYSTEM WITH ALL ACCESSORIES (Q3) | 11-07-2023 13:10:00 | MII | Qualified |
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type