Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renewal Work Of Mf Road Km 116 To Gidhaul Musajhag Road Km 8(100), 9 Under Shekhupur Vidhansabha District Budaun
|
| Description |
Renewal Work Of Mf Road Km 116 To Gidhaul Musajhag Road Km 8(100), 9 Under Shekhupur Vidhansabha District Budaun
|
| Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
| Tender Id | 2025_CEBLY_997372_1 |
|
Reference Number |
92(66)/Nivida/2025 Dt. 15-01-2025 |
| Tender Fee | 856 |
| EMD | 1.2 Lakh |
| Tender Value | |
| Place | Budaun |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1769439 |
| Start Date | January 24, 2025 14:30 |
| End Date |
Expired
31/01/2025
Expired 499 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Read moreDevelopment and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Development and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Read moreRenewal of road cc block, cd work and protection wall under special repair work pwd dn. degana.
Renewal of road cc block, cd work and protection wall under special repair work pwd dn. degana.
Read moreRejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Read moreConstruction of c.c. drain at.-warud mhasala vr.14 road ch.no.1/000 to 2/100 taluka- district- wardha
Construction of c.c. drain at.-warud mhasala vr.14 road ch.no.1/000 to 2/100 taluka- district- wardha
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreImprovement of road stretches on nh_17 from coronation bridge (km 595.20 of old nh_31) to manpong (km 597.00 )of old nh31
Improvement of road stretches on nh_17 from coronation bridge (km 595.20 of old nh_31) to manpong (km 597.00 of old n.h.31) in the district of kalimpong, west bengal.
Read moreConstruction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Construction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreUpgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Read moreof your Industry type