Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Main Road To Padariya Dham App. Road Length 0.40 Km
|
| Description |
Construction Of Main Road To Padariya Dham App. Road Length 0.40 Km
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_314317_1 |
|
Reference Number |
19/2023-24/CHH |
| Tender Fee | 10000 |
| EMD | 64600 |
| Tender Value | - |
| Place | CE PWD Sagar |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | October 05, 2023 23:30 |
| End Date |
Expired
18/10/2023
Expired 1088 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvements to basanalagadde hirekudi ngaral nej (mdr) road from km no 3.00 to 6.25 (selected reaches) (hirekudi school to nagaral) (proposed from ch 3.30km to 4.24km) in chikodi taluka of belagavi dist under hoa 5054-app e mdr road itare bandaval vechha for the year 2026-27
Improvements to basanalagadde hirekudi ngaral nej (mdr) road from km no 3.00 to 6.25 (selected reaches) (hirekudi school to nagaral) (proposed from ch 3.30km to 4.24km) in chikodi taluka of belagavi dist under hoa 5054-app e mdr road itare bandaval vechha for the year 2026-27
Read moreProcurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Read moreSupply of electric winch 2mt capacity with wire rope of size 60m*18mm (length*diameter) for movement of manpower in surge chamber at slbhes, srisailam dam west nagarkurnool (dist) - 509326, telangana
Supply of electric winch 2mt capacity with wire rope of size 60m*18mm (length*diameter) for movement of manpower in surge chamber at slbhes, srisailam dam west nagarkurnool (dist) - 509326, telangana
Read moreSupply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) im
Supply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) image processing:- auto rebar spacing first rebar layer neighboring rebar correction first layer neighboring rebar correction second layer, (iii) display settings:- concrete cover threshold slider with color palette, (iv) reporting:- instant report generation jpg (screenshot), (v) display unit specs:- screen size: from 7.9 inch to 12.9 inch, resolution : up to 2732-by-2048, memory: up to 02 tb, weight: down to 301 gm/10.6 oz, camera: up to 12 mp wide and 10 mp ultra wide, optional: usb-c, 5g, face id, (vi) display unit sensors:- three – axis gyro, accelerometer, ambient light sensor barometer built -in- gps/gnss (2) instrument. technical specifications:- (i) technology:- eddy-current, (ii) connection:- wireless, (iii) cover measuring depth:- up to 185 mm/7.3in, (iv) cover measuring accuracy:- +/-1 mm/ 0.04 in to 4 mm/ 0.16 in depending on depth , (v) rebar diameter measuring depth:- up to 63 mm/2.5 in, (vi) rebar diameter measuring accuracy:- +/-1 rebar size (possible under optimal conditions. please refer to the manual), (vii) encoder accuracy:- +/-0.5 mm/0.02 in +0.05% of measured length, (viii) max scanning speed:- 0.5 m/s – 1.7 ft/s, (ix) max line scan distance:- 1 km/ 0.6 miles, (x) display:- high-contrast loed screen, (xi) dimensions:-250x130x45 mm / 9.8x5.1x1.8 in (with cart), 190x75x45 mm / 7.5x3.0x1.8 in (without cart) (xii) weight:- 690 gm/ 1.5 ib (with cart), 300 gm / 0.7 ib (without cart), (xiii) battery:- 2x aa(nimh) rechargeable or non rechargeable removable flight-safe, 8 hours autonomy, usb-c power bank (not included)
Read moreDesign, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreBt renewal work of pipaliya kalan dhilwar padariya rajadhar madhdevera tigdda deveri padariya sitaram road length 13.50 km.
Bt renewal work of pipaliya kalan dhilwar padariya rajadhar madhdevera tigdda deveri padariya sitaram road length 13.50 km.
Read moreSpecial strengthening of padariya jagir to gajanyayi road length 5.00 km. iind call
Special strengthening of padariya jagir to gajanyayi road length 5.00 km. iind call
Read moreConstruction of link road no. 1 length 0.25 km, link road no. 2 length 0.30 km, link road no. 3 length 0.35 km, link road no. 4 length 0.40 km and link road no. 5 length - 0.33 km at bageshwar dham under pwd division chhatarpur total length 1.63 km
Construction of link road no. 1 length 0.25 km, link road no. 2 length 0.30 km, link road no. 3 length 0.35 km, link road no. 4 length 0.40 km and link road no. 5 length - 0.33 km at bageshwar dham under pwd division chhatarpur total length 1.63 km
Read moreof your Industry type