Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Top Roller Frame Fabrication For Sawang Washery Conveyors 🚧 Central Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Fabrication, Erection, And Repair Services Of The Top Roller Frame For Various Belt Conveyors At Sawang Washery, Including Bc 04, Bc 08, Bc 09, And Bc 10. 📅 Bid Submission Deadline: May 31, 2024, 11:00 Am The Earnest Money Deposit (Emd) Is Set At Inr 39,000. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Methodology, And Cost Estimates, To The Project Officer At Sawang Washery By The Stipulated Deadline. Keywords: Fabrication, Erection, Repair, Top Roller Frame, Belt Conveyors, Sawang Washery, Central Coalfields Limited, Public Sector Undertaking, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Fabrication / Erection And Repairing Of Top Roller Frame Of Different Belts Conveyor Bc 04, Bc 08, Bc 09, Bc 10 Of Sawang Washery.
|
| Description |
Fabrication / Erection And Repairing Of Top Roller Frame Of Different Belts Conveyor Bc 04, Bc 08, Bc 09, Bc 10 Of Sawang Washery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_308545_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/08 Date 20.05.2024 |
| Tender Fee | 0 |
| EMD | 3900 |
| Tender Value | - |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319713 |
| Start Date | May 22, 2024 16:30 |
| End Date |
Expired
31/05/2024
Expired 866 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreSupply, fabrication, erection, painting, installation and commissioning of new test bath with conveyor system for lpg cylinder quality checking
Supply, fabrication, erection, painting, installation and commissioning of new test bath with conveyor system for lpg cylinder quality checking
Read moreCustom bid for services - fabrication of a stool and top bracket for the 1000 mm conveyor structure trunk belt structure installed at ro incline of ballarpur colliery pits 3and4 under ballarpur sub area of ballarpur area
Custom bid for services - fabrication of a stool and top bracket for the 1000 mm conveyor structure trunk belt structure installed at ro incline of ballarpur colliery pits 3and4 under ballarpur sub area of ballarpur area
Read moreFabrication/erection and repairing of bc-4a, bc-9, bc-10 conveyor structure of deshaling plant at sawang washery.
Fabrication/erection and repairing of bc-4a, bc-9, bc-10 conveyor structure of deshaling plant at sawang washery.
Read moreFabrication/erection and repairing of bc-1, bc-06, bc-07 belt conveyor structure at deshaling, o/s plant of sawang washery.
Fabrication/erection and repairing of bc-1, bc-06, bc-07 belt conveyor structure at deshaling, o/s plant of sawang washery.
Read moreFabrication / erection of top roller frame of different belt conveyors 40bc, 51bc by pass bc, slurry bc, clean coal, middling coal bc and clean coal, middling coal shuttle bc etc. work in main plant of sawang washery for a period of 06 months.
Fabrication / erection of top roller frame of different belt conveyors 40bc, 51bc by pass bc, slurry bc, clean coal, middling coal bc and clean coal, middling coal shuttle bc etc. work in main plant of sawang washery for a period of 06 months.
Read moreRepairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.
Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.
Read moreFabrication/erection and repairing / replacement of r.o.m. b/c, picking b/c, transfer b/c, reversible b/c top carrier roller frame at p.c.h. section at sawang washery.
Fabrication/erection and repairing / replacement of r.o.m. b/c, picking b/c, transfer b/c, reversible b/c top carrier roller frame at p.c.h. section at sawang washery.
Read moreDismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.
Dismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.
Read moreDismantling, fabrication/erection and repairing of motor base and gear box base structure of bc-4a, bc-9 and bc-10 of oversize at sawang washery.
Dismantling, fabrication/erection and repairing of motor base and gear box base structure of bc-4a, bc-9 and bc-10 of oversize at sawang washery.
Read moreof your Industry type