Tender Details

About Tender

🏗️ Invitation For Bids: Top Roller Frame Fabrication For Sawang Washery Conveyors 🚧 Central Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Fabrication, Erection, And Repair Services Of The Top Roller Frame For Various Belt Conveyors At Sawang Washery, Including Bc 04, Bc 08, Bc 09, And Bc 10. 📅 Bid Submission Deadline: May 31, 2024, 11:00 Am The Earnest Money Deposit (Emd) Is Set At Inr 39,000. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Methodology, And Cost Estimates, To The Project Officer At Sawang Washery By The Stipulated Deadline. Keywords: Fabrication, Erection, Repair, Top Roller Frame, Belt Conveyors, Sawang Washery, Central Coalfields Limited, Public Sector Undertaking, Tender, Bid Submission
Particulars Details
Title
Fabrication / Erection And Repairing Of Top Roller Frame Of Different Belts Conveyor Bc 04, Bc 08, Bc 09, Bc 10 Of Sawang Washery.
Description
Fabrication / Erection And Repairing Of Top Roller Frame Of Different Belts Conveyor Bc 04, Bc 08, Bc 09, Bc 10 Of Sawang Washery.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_308545_1
Reference
Number
SGW/KTA/ENM/E-Tender/24-25/08 Date 20.05.2024
Tender Fee 0
EMD 3900
Tender Value -
Place Office of the Project Officer, Sawang Washery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319713

Start Date May 22, 2024 16:30
End Date
Expired 31/05/2024

Expired 866 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.

Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.

Read more
Supply, fabrication, erection, painting, installation and commissioning of new test bath with conveyor system for lpg cylinder quality checking

Supply, fabrication, erection, painting, installation and commissioning of new test bath with conveyor system for lpg cylinder quality checking

Read more
Custom bid for services - fabrication of a stool and top bracket for the 1000 mm conveyor structure trunk belt structure installed at ro incline of ballarpur colliery pits 3and4 under ballarpur sub area of ballarpur area

Custom bid for services - fabrication of a stool and top bracket for the 1000 mm conveyor structure trunk belt structure installed at ro incline of ballarpur colliery pits 3and4 under ballarpur sub area of ballarpur area

Read more
Fabrication/erection and repairing of bc-4a, bc-9, bc-10 conveyor structure of deshaling plant at sawang washery.

Fabrication/erection and repairing of bc-4a, bc-9, bc-10 conveyor structure of deshaling plant at sawang washery.

Read more
Fabrication/erection and repairing of bc-1, bc-06, bc-07 belt conveyor structure at deshaling, o/s plant of sawang washery.

Fabrication/erection and repairing of bc-1, bc-06, bc-07 belt conveyor structure at deshaling, o/s plant of sawang washery.

Read more
Fabrication / erection of top roller frame of different belt conveyors 40bc, 51bc by pass bc, slurry bc, clean coal, middling coal bc and clean coal, middling coal shuttle bc etc. work in main plant of sawang washery for a period of 06 months.

Fabrication / erection of top roller frame of different belt conveyors 40bc, 51bc by pass bc, slurry bc, clean coal, middling coal bc and clean coal, middling coal shuttle bc etc. work in main plant of sawang washery for a period of 06 months.

Read more
Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.

Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.

Read more
Fabrication/erection and repairing / replacement of r.o.m. b/c, picking b/c, transfer b/c, reversible b/c top carrier roller frame at p.c.h. section at sawang washery.

Fabrication/erection and repairing / replacement of r.o.m. b/c, picking b/c, transfer b/c, reversible b/c top carrier roller frame at p.c.h. section at sawang washery.

Read more
Dismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.

Dismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.

Read more
Dismantling, fabrication/erection and repairing of motor base and gear box base structure of bc-4a, bc-9 and bc-10 of oversize at sawang washery.

Dismantling, fabrication/erection and repairing of motor base and gear box base structure of bc-4a, bc-9 and bc-10 of oversize at sawang washery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise