Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rato Make Power Supply
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/5186479 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 26, 2024 17:40 |
| End Date |
Expired
16/08/2024
Expired 777 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | RATO COMMUNICATIONS AND ELECTRONICS PRIVATE LIMITED | Make : RATO Model : R-240-275-W-M Title : R-240-275W-M MULTI OUTPUT POWER SUPPLY | 14-08-2024 11:31:54 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | RATO COMMUNICATIONS AND ELECTRONICS PRIVATE LIMITED(MSE)( MSE Social Category:General ) | Item Categories : RATO MAKE POWER SUPPLY | 369576.00 | L1 |
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreTggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreRato make power supplies output supply 48v dc/15a,rato make power supplies output supply 24v dc/5a,
Read more
of your Industry type