Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rob At Km 1/8 Of Namakkal Bypass Road Km 0/8 2/2 Incl. Railway Portion At Railway Km 47/5 6 In Between Kalangani And Namakkal Railway Stations In Sa Krr Section In The Main Work Of Forming Bypass To Namakkal Town Km 0/8 6/0 (Phase Ii)
|
Description |
Construction Of Rob At Km 1/8 Of Namakkal Bypass Road Km 0/8 2/2 Incl. Railway Portion At Railway Km 47/5 6 In Between Kalangani And Namakkal Railway Stations In Sa Krr Section In The Main Work Of Forming Bypass To Namakkal Town Km 0/8 6/0 (Phase Ii)
|
Organisation | Highways | State Govt. and UT |
Tender Id | 2025_HWAY_517718_1 |
Reference Number |
TN.No.35 /2024-2025 / SDO/Dated.31.12.2024 |
Tender Fee | 0 |
EMD | 30.08 Lakh |
Tender Value | |
Place | Salem |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=616590 |
Start Date | January 10, 2025 23:45 |
End Date |
12/02/2025 ( Expired 67 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur
Construction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur
Read moreConstruction of rob on ramganj mandi jhalawar railway lc no. 3-a/2-e suket pipaliya road km. 8/0 (mdr-109)
Construction of rob on ramganj mandi jhalawar railway lc no. 3-a/2-e suket pipaliya road km. 8/0 (mdr-109)
Read moreProviding and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus
Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreSupply of aggregate of 2-lane r.o.b. in lieu of l-xing no. 96c at km 200/16-18 on ambala-saharanpur rail section in between nakur-chilkana road in distt. saharanpur
Supply of aggregate of 2-lane r.o.b. in lieu of l-xing no. 96c at km 200/16-18 on ambala-saharanpur rail section in between nakur-chilkana road in distt. saharanpur
Read moreof your Industry type