Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Providing Handling Spreading And Leveling Granite Aggregates Over The Exi
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2023/B/3910306 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 06, 2023 20:21 |
| End Date |
Expired
27/09/2023
Expired 1117 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | AYUSH CONSTRUCTIONS | 27-09-2023 09:18:41 | Registered with designated Agency / Authority | MSE | Qualified |
| 2 | B RAVIRAJ INFRA CONSTRUCTIONS ( BRIC ) | 26-09-2023 22:39:22 | Start-up | MSE | Qualified |
| 3 | K.MURUGAN | 26-09-2023 17:19:14 | Registered with designated Agency / Authority | MSE | Qualified |
| 4 | NIXON S FERNANDES | 26-09-2023 20:09:23 | MSE | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | B RAVIRAJ INFRA CONSTRUCTIONS ( BRIC ) | Item Categories : Custom Bid for Services - Providing handling spreading and leveling granite aggregates over the exi | 8395000.00 | L1 |
| 2 | AYUSH CONSTRUCTIONS | Item Categories : Custom Bid for Services - Providing handling spreading and leveling granite aggregates over the exi | 8730125.00 | L2 |
| 3 | K.MURUGAN | Item Categories : Custom Bid for Services - Providing handling spreading and leveling granite aggregates over the exi | 11054000.00 | L3 |
| 4 | NIXON S FERNANDES( MSE Social Category:OBC ) | Item Categories : Custom Bid for Services - Providing handling spreading and leveling granite aggregates over the exi | 13006000.00 | L4 |
Supply and stacking of different size aggregates and sand at km 73.00 hmp site and at km 120.00 hmp site on oksrt road for spill over resurfacing work during 2026-27 under 91 rcc 14 brtf project vartak -retender 02nd call
Supply and stacking of different size aggregates and sand at km 73.00 hmp site and at km 120.00 hmp site on oksrt road for spill over resurfacing work during 2026-27 under 91 rcc 14 brtf project vartak -retender 02nd call
Read moreCustom bid for services - receipt, handling, erection, commissioning and handing over of 3 nos of 110mvar, 765kv 1ph shunt reactor at powergrid madhugiri s/s karnataka
Custom bid for services - receipt, handling, erection, commissioning and handing over of 3 nos of 110mvar, 765kv 1ph shunt reactor at powergrid madhugiri s/s karnataka
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreNctps i se m ii circle ahp dn breakdown routine maintenance of recovery water lines no 2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period of one year from the date of taken over of site
Nctps i se m ii circle ahp dn breakdown routine maintenance of recovery water lines no 2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period of one year from the date of taken over of site
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreSupply, spreading and leveling of moorum complete
Supply, spreading and leveling of moorum complete in municipal council malajkhand
Read moreSupply, spreading and leveling of moorum complete work
Supply, spreadingand leveling of moorum complete work in municipal council malajkhand.
Read moreSupply, spreading and leveling of moorum complete work
Supply spreading and leveling of moorum complete in municipal council malajkhand.
Read moreof your Industry type