Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of New Construction Of Two Lane Road Including Paved Shoulder From Haryana Uttar Pradesh Border To Nakud Saharanpur Road In Saharanpur District
|
| Description |
Work Of New Construction Of Two Lane Road Including Paved Shoulder From Haryana Uttar Pradesh Border To Nakud Saharanpur Road In Saharanpur District
|
| Organisation | Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT |
| Tender Id | 2026_CEMRT_1103400_1 |
|
Reference Number |
8271/104M-S/2025 Date 20-12-2025 |
| Tender Fee | 2714 |
| EMD | 51 Lakh |
| Tender Value | - |
| Place | saharanpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2034787 |
| Start Date | January 09, 2026 17:30 |
| End Date |
Expired
16/01/2026
Expired 271 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreBalance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Balance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Read moreUpgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreUpgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read moreWard 6 me nakud road pr ripudaman ke makan se anil batar k makan tak cc sadak v nali nirman
Ward 6 me nakud road pr ripudaman ke makan se anil batar k makan tak cc sadak v nali nirman
Read moreConst. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreof your Industry type