Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Construction Material And Equipment For Construction Of Wall Compaund To Zilha P Arishad Primary School Pipari 121 Meter To 240 Meter Taluka Arvi District Wardha
|
Description |
Supply Of Construction Material And Equipment For Construction Of Wall Compaund To Zilha P Arishad Primary School Pipari 121 Meter To 240 Meter Taluka Arvi District Wardha
|
Organisation | RDD-CEO-WARDHA | State Govt. and UT |
Tender Id | 2025_WARDH_1138409_1 |
Reference Number |
wall comp pipri 121 to 240 |
Tender Fee | 1000 |
EMD | 5000 |
Tender Value | |
Place | Grampanchayat pipari |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1983297 |
Start Date | January 16, 2025 20:30 |
End Date |
23/01/2025 ( Expired 145 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreConsultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years part 2 at bhadson town, district patiala, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years part 2 at bhadson town, district patiala, punjab under amrut 2.0 scheme
Read moreConstruction of boundary wall for the site of mrf and waste to compost plant under the scheme of 15th fc tied grant for swm under titabar municipal board
Construction of boundary wall for the site of mrf and waste to compost plant under the scheme of 15th fc tied grant for swm under titabar municipal board
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at kotha guru, district bathinda, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at kotha guru, district bathinda, punjab under amrut 2.0 scheme
Read moreConstruction of atal path from from renwal manji market tiraha to primary school no. 2 via chowki wale balaji, mori darbar balaji and main habitation area in village muhana
Construction of atal path from from renwal manji market tiraha to primary school no. 2 via chowki wale balaji, mori darbar balaji and main habitation area in village muhana
Read moreConstruction of water supply and storage scheme
Construction of water supply and storage scheme at lower balija, district upper subansiri (arunachal pradesh) under operation sadbhavana for the financialyear 2025-26
Read moreConstruction of central prison, 113 nos. of prison staff quarters, cement concrete road and security perimeter wall (for men prison) at therkkutheru utkadai sembur village, melur taluk in madurai district (phase-i)
Construction of central prison, 113 nos. of prison staff quarters, cement concrete road and security perimeter wall (for men prison) at therkkutheru utkadai sembur village, melur taluk in madurai district (phase-i)
Read moreof your Industry type