Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing, Changing And Replacement Of Different Conveyors Column Of Bc 4 A, Bc 4, Bc 5, Bc 6 Etc. And Bc 1, Bc 3 Er Weight Body Structure Of Different Belt Conveyor In Oversize Restriction Plant And Deshaling Plant At Sawang Washery.
|
Description |
Repairing, Changing And Replacement Of Different Conveyors Column Of Bc 4 A, Bc 4, Bc 5, Bc 6 Etc. And Bc 1, Bc 3 Er Weight Body Structure Of Different Belt Conveyor In Oversize Restriction Plant And Deshaling Plant At Sawang Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_312682_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/49 Date 16.07.2024 |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324036 |
Start Date | July 17, 2024 16:30 |
End Date |
26/07/2024 ( Expired 335 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement of conveyor drums, bearings, idlers, idler frames etc. of various conveyors in offsite area and the np plant, fact cd
Replacement of conveyor drums, bearings, idlers, idler frames etc. of various conveyors in offsite area and the np plant, fact cd
Read moreRepairing of side guard and skart rubber, channel, angle, joist and plate etc. of unit no. 52 and 74 belt conveyor of raw coal section at kathara washery
Repairing of side guard and skart rubber, channel, angle, joist and plate etc. of unit no. 52 and 74 belt conveyor of raw coal section at kathara washery
Read moreTransporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Transporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Read moreRepairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Repairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Read moreRestoration and strengthening of conveyor support structure of belt conveyors 316 and 317b at screening plant i
Restoration and strengthening of conveyor support structure of 
 belt conveyors 316 and 317b 
 at screening plant i
Read moreRepairing/ strengthening of take-up structure, side stairs and bracing for unit 701 and 901 belt conveyor of moonidih coal washery.
Repairing/ strengthening of take-up structure, side stairs and bracing for unit 701 and 901 belt conveyor of moonidih coal washery.
Read moreAssisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Assisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Read moreReplacement of 1400mm wide conveyor belt in unit 502, 105, 201 n 1000mm wide belt conveyor in unit 801-a and replacement of damaged conveyor belting pieces at different belt conveyors under section-v (as and when required) at moonidih coal washery.
Replacement of 1400mm wide conveyor belt in unit 502, 105, 201 n 1000mm wide belt conveyor in unit 801-a and replacement of damaged conveyor belting pieces at different belt conveyors under section-v (as and when required) at moonidih coal washery.
Read more(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
Read moreRepairing and overhauling of jig air blower and repairing of side cover and tail tumbler under deshaling plant of sawang washery.
Repairing and overhauling of jig air blower and repairing of side cover and tail tumbler under deshaling plant of sawang washery.
Read moreof your Industry type