Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Fabrication/Erection And Repairing Of Motor Base And Gear Box Base Structure Of Bc 4 A, Bc 9 And Bc 10 Of Oversize At Sawang Washery.
|
| Description |
Dismantling, Fabrication/Erection And Repairing Of Motor Base And Gear Box Base Structure Of Bc 4 A, Bc 9 And Bc 10 Of Oversize At Sawang Washery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_288693_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/23-24/42 Date 13.09.2023 |
| Tender Fee | |
| EMD | 2800 |
| Tender Value | |
| Place | Office of the Project Officer, Sawang Washery. |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 14, 2023 16:30 |
| End Date |
Expired
23/09/2023
Expired 1006 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
E-tender for the fabrication, erection and commissioning of boiler chimney at noga factory nagpur
E-tender for the fabrication, erection and commissioning of boiler chimney at noga factory nagpur
Read moreFabrication and erection of structural works at higher elevation (15 mtr to 30 mtr) in tnpl unit- ii
Fabrication and erection of structural works at higher elevation (15 mtr to 30 mtr) in tnpl unit- ii, trichy.
Read moreRate contract for supply, fabrication and erection of mild steel canopy and allied works at retail outlets under guwahati, tinsukia, silchar and imphal divisional offices of ioaod state office
Rate contract for supply, fabrication and erection of mild steel canopy and allied works at retail outlets under guwahati, tinsukia, silchar and imphal divisional offices of ioaod state office
Read moreRepairing of vct boiler no. wbl-6035 at madhaipur colliery under pandaveswar area and repairing of boiler injector and steam pipeline 9, 1, 5 and 6 pit of madhaipur colliery
Repairing of vct boiler no. wbl-6035 at madhaipur colliery under pandaveswar area and repairing of boiler injector and steam pipeline 9, 1, 5 and 6 pit of madhaipur colliery
Read moreFabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.
Fabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.
Read moreRefurbishment/repairing of existing 3-phase induction motor 270 hp vide motor serial no (kirloskar) and supply, installation of mounting and accessories at water lifting station stage 1st near khree sultancho stadium biamathang kargil. (under re-act
Refurbishment/repairing of existing 3-phase induction motor 270 hp vide motor serial no (kirloskar) and supply, installation of mounting and accessories at water lifting station stage 1st near khree sultancho stadium biamathang kargil. (under re-act
Read moreRepair / maintenance of lt oh lines, lt panels, switch gear like apfc panels and lt ug cable including security lights, service connection cables and junction box at varunapuri under ge (nw) vasco
Repair / maintenance of lt oh lines, lt panels, switch gear like apfc panels and lt ug cable including security lights, service connection cables and junction box at varunapuri under ge (nw) vasco
Read moreRepairs maintenance to sewage system by cleaning of septic tank, manholes, sewage lines, gully traps etc at mcpos bldg g plus 10 multi storey at kadamba and manzil creek and site a3 of naval base karwar
Repairs maintenance to sewage system by cleaning of septic tank, manholes, sewage lines, gully traps etc at mcpos bldg g plus 10 multi storey at kadamba and manzil creek and site a3 of naval base karwar
Read moreFabrication/erection and repairing of bc-4a, bc-9, bc-10 conveyor structure of deshaling plant at sawang washery.
Fabrication/erection and repairing of bc-4a, bc-9, bc-10 conveyor structure of deshaling plant at sawang washery.
Read moreFabrication/erection and repairing of tail drum structure, gear box structure motor base structure of bc-5, 40bc, clean coal bc, middling coal bc in main plant of sawang washery.
Fabrication/erection and repairing of tail drum structure, gear box structure motor base structure of bc-5, 40bc, clean coal bc, middling coal bc in main plant of sawang washery.
Read moreof your Industry type