Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling, Changing And Fitting Of 72 Nos. Top Roller Frame Size 1250 Mm Of 4 A Bc, Bc 1, Bc 2, Bc 5, Bc 6 In Oversize Restriction Plant And Deshaling Plant Of Sawang Washery.
|
Description |
Dismantling, Changing And Fitting Of 72 Nos. Top Roller Frame Size 1250 Mm Of 4 A Bc, Bc 1, Bc 2, Bc 5, Bc 6 In Oversize Restriction Plant And Deshaling Plant Of Sawang Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_331783_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/97 Date 08.03.2025 |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343924 |
Start Date | March 10, 2025 16:30 |
End Date |
19/03/2025 ( Expired 109 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Electrical work to be carried out in resident vacant flat in h-1,f-2,f-4,f-5 and f-6 at teacher transit hostel (tth) dhaka complex and provision of dedicated pipe earth and elcb for the 56 nos of tth resident flats etc at university of delhi
Electrical work to be carried out in resident vacant flat in h-1,f-2,f-4,f-5 and f-6 at teacher transit hostel (tth) dhaka complex and provision of dedicated pipe earth and elcb for the 56 nos of tth resident flats etc at university of delhi
Read moreRepair work of plant godown no.-1, no.-2,no.-3,godown no.4,no.5,no.-6,no.-7,no.-8, no.-9,no.-10,no.-11,no.-12 and const.of boundary wall with gate i/c insttalation of sign board, const.of drain and cc road with culvert of markfed at govindpura,bhopal
Repair work of plant godown no.-1, no.-2,no.-3,godown no.4,no.5,no.-6,no.-7,no.-8, no.-9,no.-10,no.-11,no.-12 and const.of boundary wall with gate i/c insttalation of sign board, const.of drain and cc road with culvert of markfed at govindpura,bhopal
Read moreDismantling, fabrication / erection and changing / replacement of woven wire panel of sc-2 screen and repairing / replacement of step deck panel in sc-1 screen in o/s and deshaling plant of sawang washery.
Dismantling, fabrication / erection and changing / replacement of woven wire panel of sc-2 screen and repairing / replacement of step deck panel in sc-1 screen in o/s and deshaling plant of sawang washery.
Read moreTransporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Transporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Read moreProcurement of tarpaulins of size (11ft x 17 ft) containing 3.8 kilogram (5 -2.5) with two (2)nos of gta logo of size( 8 inches dia)with loadingunloading and also to deliver the tarpaulins at the following divisions - (1) kalimpong engineering
Procurement of tarpaulins of size (11ft x 17 ft) containing 3.8 kilogram (5 -2.5) with two (2)nos of gta logo of size( 8 inches dia)with loadingunloading and also to deliver the tarpaulins at the following divisions - (1) kalimpong engineering
Read moreConstruction of siltation chamber and leach pit (7 nos) at 1) goyalpara dugdha samity submersible pump 2) goyalpara primary school 3) goyalpara baroaritala 4) goyalpara mathkalitala 5) birahimpur dakshineswar shib mandir 6) birahimpur ssk submersible
Construction of siltation chamber and leach pit (7 nos) at 1) goyalpara dugdha samity submersible pump 2) goyalpara primary school 3) goyalpara baroaritala 4) goyalpara mathkalitala 5) birahimpur dakshineswar shib mandir 6) birahimpur ssk submersible
Read moreConstruction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Read moreProcurement of tarpaulins of size (11ft x 17 ft) containing 3.8 kilogram (5 -2.5 ) with two (2)nos of gta logo of size( 8 inches dia)with loading /unloading and also to deliver the tarpaulins at the following divisions - (1) kalimpong engineer
Procurement of tarpaulins of size (11ft x 17 ft) containing 3.8 kilogram (5 -2.5 ) with two (2)nos of gta logo of size( 8 inches dia)with loading /unloading and also to deliver the tarpaulins at the following divisions - (1) kalimpong engineer
Read moreAssisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Assisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Read moreClubbed work (1) demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area,(2) cutting, dismantling, demounting, repairing, position
Clubbed work (1) demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area,(2) cutting, dismantling, demounting, repairing, position
Read moreof your Industry type