Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of 32 Cu Mtr. Walk In Cooler (Plus 2 To Plus 8 Degree C) With Civil Work
|
| Description |
Installation Of 32 Cu Mtr. Walk In Cooler (Plus 2 To Plus 8 Degree C) With Civil Work For Use In Central Medical Store Department Of Esi Scheme Rajasthan Jaipur
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_ESIC_377526_1 |
|
Reference Number |
F/STORE/WIC TENDER/2023-24/07 |
| Tender Fee | 1000 |
| EMD | 63000 |
| Tender Value | - |
| Place | DIRECTORATE ESI LAXMI NAGAR AJMER ROAD JAIPUR |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | December 22, 2023 15:00 |
| End Date |
Expired
07/01/2024
Expired 1015 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Esti cartidge plus 130 degree c for overheat protection switch etc.
Esti cartidge plus 130 degree c for overheat protection switch etc.
Read moreTramadol 37.5mg plus paracetamol 32 5 mg tablet/cap
Tramadol 37.5mg plus paracetamol 32 5 mg tablet/cap
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreSupply of gas argon-carbondioxide cylinder with a mixture of 80: 20 ratio in 7.2 cu. mtr. capacity cyl
Supply of gas argon-carbondioxide cylinder with a mixture of 80: 20 ratio in 7.2 cu. mtr. capacity cyl
Read moreDigital device 13.6 inch display 8 core 360 degree,microsoft surface device snapdragon x plus,high end laptop - notebook
Digital device 13.6 inch display 8 core 360 degree,microsoft surface device snapdragon x plus,high end laptop - notebook
Read moreRestoration of sherpur road where the original road was completely washed away including damaged road 145 mtr breast wall 145 mtr drain 153 mtr and retaining wall 122 mtr plus 20 mtr towards the nala on oru sherpur road near pump house cps1
Restoration of sherpur road where the original road was completely washed away including damaged road 145 mtr breast wall 145 mtr drain 153 mtr and retaining wall 122 mtr plus 20 mtr towards the nala on oru sherpur road near pump house cps1
Read moreDesert cooler 200 ltrs,side by side 600 ltr refrigerator,1.5 sqmm 2 core wire 90 mtr,2.5 sqmm 2 core wire 90 mtr,dc to ac converter extension board
Desert cooler 200 ltrs,side by side 600 ltr refrigerator,1.5 sqmm 2 core wire 90 mtr,2.5 sqmm 2 core wire 90 mtr,dc to ac converter extension board
Read moreSpl repair/replacement to ber water coller, desert cooler and deep freezer of various capacity alongwith certain allied wks, ceiling fans with bldg fans and ber geysers 25/50 ltrs and provn of walk in cooler at med store of mh ayodhya under age (i)
Spl repair/replacement to ber water coller, desert cooler and deep freezer of various capacity alongwith certain allied wks, ceiling fans with bldg fans and ber geysers 25/50 ltrs and provn of walk in cooler at med store of mh ayodhya under age (i)
Read moreProcurement of petroleum cutting gas conforming to heating value like minimum neutral flame temperature 2950 degree celsius, total heat emission:- 23244 kcal/m cubic (kilo calorie per cubic mtr.), total heat value:- 12030 kcal/kg., specific gravity (in gaseous state):- 1.52, vapour pressure (at 37.8 degree celsius):- 120 psi & boiling range (-2) degree celsius.
Procurement of petroleum cutting gas conforming to heating value like minimum neutral flame temperature 2950 degree celsius, total heat emission:- 23244 kcal/m cubic (kilo calorie per cubic mtr.), total heat value:- 12030 kcal/kg., specific gravity (in gaseous state):- 1.52, vapour pressure (at 37.8 degree celsius):- 120 psi & boiling range (-2) degree celsius.
Read moreCurtain 7 ft,curtain 5 ft,bedsheet,pillow,led tv 32 inch,ac 1.5 ton,desert cooler,crockery,dish tv,gas stove,steel handwash
Curtain 7 ft,curtain 5 ft,bedsheet,pillow,led tv 32 inch,ac 1.5 ton,desert cooler,crockery,dish tv,gas stove,steel handwash
Read moreof your Industry type