Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repair Of Rehabilitation And Upgradation Of Digras Darwha Karanja Section In (Km 0.000 To 74.351) Nh 361 C Two Lanes With Paved Shoulder Configuration In The State Of Maharashtra.(Under Risk And Cost).
|
Description |
Repair Of Rehabilitation And Upgradation Of Digras Darwha Karanja Section In (Km 0.000 To 74.351) Nh 361 C Two Lanes With Paved Shoulder Configuration In The State Of Maharashtra.(Under Risk And Cost).
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2025_MoRTH_854817_1 |
Reference Number |
53/EENH/AKL/2024-25, Dt.26/03/2025 |
Tender Fee | 11800 |
EMD | 1.91 Lakh |
Tender Value | |
Place | Digras Darwha |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=898730 |
Start Date | March 27, 2025 23:25 |
End Date |
09/07/2025 ( Expired 6 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of major bridge, minor bridge service roads,rcc drain, culverts and bus bay between km 367.200 to km 450.170 talgaon . kalmath .zarap section on nh.66 in the state of maharashtra on epc mode
Construction of major bridge, minor bridge service roads,rcc drain, culverts and
 bus bay between km 367.200 to km 450.170 talgaon . kalmath .zarap section on nh.66 in
 the state of maharashtra on epc mode
Read moreRehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreRfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Read moreConsultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat
Consultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder of porbandar- kalavad section of nh-151k
Consultancy services of independent engineer for upgradation to two lane with paved shoulder of porbandar-bhanvad-jamjodhpur-kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat
Read moreConsultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48
Consultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48 junction-sukesh-nanapondha-kaprada section of nh-848 in the state of gujarat
Read moreof your Industry type