Tender Details

Particulars Details
Title
Repair Of Rehabilitation And Upgradation Of Digras Darwha Karanja Section In (Km 0.000 To 74.351) Nh 361 C Two Lanes With Paved Shoulder Configuration In The State Of Maharashtra.(Under Risk And Cost).
Description
Repair Of Rehabilitation And Upgradation Of Digras Darwha Karanja Section In (Km 0.000 To 74.351) Nh 361 C Two Lanes With Paved Shoulder Configuration In The State Of Maharashtra.(Under Risk And Cost).
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 11800
EMD 1.91 Lakh
Tender Value
Place Digras Darwha
Link

AAAAAAAAAA

Login to view
Start Date March 27, 2025 23:25
End Date

09/05/2025 ( 19 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Consultancy services for ae for supervision of rehabilitation and upgradation of wardha (salod hirapur) pulgaon section to 2ps in the state of maharashtra on epc mode.

Consultancy services for ae for supervision of rehabilitation and upgradation of wardha (salod hirapur) pulgaon section to 2ps in the state of maharashtra on epc mode.

Read more
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.

Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.

Read more
Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode

Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.

Read more
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.

Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.

Read more
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode

Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode

Read more
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire

Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire

Read more
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.

Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.

Read more
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh

Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh

Read more
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise