Tender Details

Particulars Details
Title
Providing Toe Wall Adjacent To Embankment/Dump Portion For Protection Of Soil Erosion In Ob Dump Area At Jampali Ocm Of Jampali Sub Area.(2nd Call)
Description
Providing Toe Wall Adjacent To Embankment/Dump Portion For Protection Of Soil Erosion In Ob Dump Area At Jampali Ocm Of Jampali Sub Area.(2nd Call)
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_337718_1
Reference
Number
SECL/GM/RGH/SOC/e-Tender/ 2025-26/19 dtd 16.06.2025
Tender Fee 0
EMD 1.54 Lakh
Tender Value -
Place Raigarh
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350099

Start Date June 18, 2025 15:30
End Date
Expired 03/07/2025

Expired 468 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)

Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)

Read more
Providing toe wall adjacent to embankment/dump portion for protection of soil erosion in ob dump area at jampali ocm of jampali sub area.

Providing toe wall adjacent to embankment/dump portion for protection of soil erosion in ob dump area at jampali ocm of jampali sub area.

Read more
Providing toe wall adjacent to embankment/dump portion for portion of soil erosion from water filling point near dumarpali village at jampali ocm of jampali sub area.

Providing toe wall adjacent to embankment/dump portion for portion of soil erosion from water filling point near dumarpali village at jampali ocm of jampali sub area.

Read more
Repairing of guard wall at toe of ob dump near intermediate sump to towards upper ramp portion of charan tola ob dump under rocp.

Repairing of guard wall at toe of ob dump near intermediate sump to towards upper ramp portion of charan tola ob dump under rocp.

Read more
Providing gabion wall mesh at toe of ob dump near sand segregation plant at bhanegaon ocm under bssa.

Providing gabion wall mesh at toe of ob dump near sand segregation plant at bhanegaon ocm under bssa.

Read more
Construction of toe wall along road embankment near uta sump for protection of soil erosion under rocp.

Construction of toe wall along road embankment near uta sump for protection of soil erosion under rocp.

Read more
Providing and fixing of lighting arrester at ob dumps of jampali ocm, secl, raigarh area.

Providing and fixing of lighting arrester at ob dumps of jampali ocm, secl, raigarh area.

Read more
Construction of toe wall beside reliance ob dump under kapasara colliery.

Construction of toe wall beside reliance ob dump under kapasara colliery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise