Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Toe Wall Construction Project For South Eastern Coalfields Limited 🏗️ South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of A Toe Wall Adjacent To The Embankment/Dump Portion To Mitigate Soil Erosion At Jampali Ocm, Jampali Sub Area, Near Dumarpali Village In Raigarh. 📅 Bid Submission Deadline: April 19, 2024, 5:00 Pm The Earnest Money Deposit (Emd) Is Set At Inr 427,000. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Project's Environmental And Safety Standards. Keywords: Toe Wall Construction, Soil Erosion, South Eastern Coalfields Limited, Public Sector Undertaking, Environmental Protection, Raigarh, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Providing Toe Wall Adjacent To Embankment/Dump Portion For Portion Of Soil Erosion From Water Filling Point Near Dumarpali Village At Jampali Ocm Of Jampali Sub Area.
|
| Description |
Providing Toe Wall Adjacent To Embankment/Dump Portion For Portion Of Soil Erosion From Water Filling Point Near Dumarpali Village At Jampali Ocm Of Jampali Sub Area.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_306256_1 |
|
Reference Number |
SECL/GM/RGH/SOC/e-Tender/ 2024-25/01 dtd 04.04.24 |
| Tender Fee | 0 |
| EMD | 42700 |
| Tender Value | - |
| Place | Raigarh |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317350 |
| Start Date | April 08, 2024 15:30 |
| End Date |
Expired
19/04/2024
Expired 912 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreProviding toe wall adjacent to embankment/dump portion for protection of soil erosion in ob dump area at jampali ocm of jampali sub area.
Providing toe wall adjacent to embankment/dump portion for protection of soil erosion in ob dump area at jampali ocm of jampali sub area.
Read moreProviding toe wall adjacent to embankment/dump portion for protection of soil erosion in ob dump area at jampali ocm of jampali sub area.(2nd call)
Providing toe wall adjacent to embankment/dump portion for protection of soil erosion in ob dump area at jampali ocm of jampali sub area.(2nd call)
Read moreConstruction of toe wall along road embankment near uta sump for protection of soil erosion under rocp.
Construction of toe wall along road embankment near uta sump for protection of soil erosion under rocp.
Read moreConstruction of toe wall along road embankment lower side from existing toe wall towards near uta sump for protection of toe from erosion under rocp.
Construction of toe wall along road embankment lower side from existing toe wall towards near uta sump for protection of toe from erosion under rocp.
Read moreMadhava nagar streets and adjacent streets and sundar nagar soil filling
Madhava nagar streets and adjacent streets and sundar nagar soil filling
Read moreMadhav nagar streets and adjacent streets and sunder nagar soil filling
Madhav nagar streets and adjacent streets and sunder nagar soil filling
Read moreSupplying and laying of vetiver slips for dump slope stabilization & reducing the soil erosion at da
Supplying and laying of vetiver slips for dump slope stabilization & reducing the soil erosion at dalli mech mines.
Read moreProviding gabion wall mesh at toe of ob dump near sand segregation plant at bhanegaon ocm under bssa.
Providing gabion wall mesh at toe of ob dump near sand segregation plant at bhanegaon ocm under bssa.
Read moreof your Industry type