Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Toe Wall Beside Reliance Ob Dump Under Kapasara Colliery.
|
| Description |
Construction Of Toe Wall Beside Reliance Ob Dump Under Kapasara Colliery.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_320181_1 |
|
Reference Number |
ECL/GM/MA/CE/24-25/eTender/325 Dt. 29.10.2024 |
| Tender Fee | 0 |
| EMD | 16600 |
| Tender Value | - |
| Place | Kapasara Group |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331901 |
| Start Date | October 31, 2024 19:30 |
| End Date |
Expired
11/11/2024
Expired 701 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreErection of 220v overhead line (two-wire) from gkkc to new coal dump for installation of cctv camera under cpwd-12, gkkc colliery, kusunda area
Erection of 220v overhead line (two-wire) from gkkc to new coal dump for installation of cctv camera under cpwd-12, gkkc colliery, kusunda area
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreGrassing at ob dump at kapasara ocp under mugma area.
Grassing at ob dump at kapasara ocp under mugma area.
Read moreConstruction of boundary wall beside o.b. dump at kapasara ocp.
Construction of boundary wall beside o.b. dump at kapasara ocp.
Read moreConstruction of toe wall around ob dump of chapapur-ii ocp under chapapur colliery, mugma area.
Construction of toe wall around ob dump of chapapur-ii ocp under chapapur colliery, mugma area.
Read moreConstruction of rcc toe wall at the toe of ob dump near lalghutua under rocp.
Construction of rcc toe wall at the toe of ob dump near lalghutua under rocp.
Read moreConstruction of toe wall along ob dump of tetariakhar ocp, rajhara area
Construction of toe wall along ob dump of tetariakhar ocp, rajhara area
Read moreof your Industry type