Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Pump 2000 Gpm
|
| Description |
Repairing Of Pump 2000 Gpm
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_286786_1 |
|
Reference Number |
BCCL/BA-IX/ENM/23-24/144 22/08/2023 |
| Tender Fee | - |
| EMD | 3600 |
| Tender Value | - |
| Place | BASTACOLLA AREA ENM DEPARTMENT |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 23, 2023 14:30 |
| End Date |
Expired
06/09/2023
Expired 1132 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 33kv current transformers (2000-1000-600/1-1-1)a
Supply of 33kv current transformers (2000-1000-600/1-1-1)a
Read moreSupply of heating elements (baskets) of aph 27.5 vimt 2000 (double sealing)
Supply of heating elements (baskets) of aph 27.5 vimt 2000 (double sealing)
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Read moreProviding of 2000 nos temporary lights with 120 w led lights at various locations in 199-ramgopalpet ward in kavadiguda circle-40 for the occation of bathukamma festival for f/y 2026. for 11 days ( dates and quantity will be informed by field engineer incharge)
Providing of 2000 nos temporary lights with 120 w led lights at various locations in 199-ramgopalpet ward in kavadiguda circle-40 for the occation of bathukamma festival for f/y 2026. for 11 days ( dates and quantity will be informed by field engineer incharge)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreRepairing of 2000 gpm 150
Repairing of 2000 gpm 150 
 meter head pump of birsa 
 project
Read moreRepairing 2000 gpm 150 mtr
Repairing 2000 gpm 150 mtr head pump make flowmore sl no 17042951/20/07 of birsa project
Read moreProviding pump foundation for 1000 gpm, 2000 gpm and 3000 gpm pumps under rajrappa project
Providing pump foundation for 1000 gpm, 2000 gpm and 3000 gpm pumps under rajrappa project
Read moreProviding pump foundation for 1000 gpm, 2000 gpm and 3000 gpm pumps under rajrappa project
Providing pump foundation for 1000 gpm, 2000 gpm and 3000 gpm pumps under rajrappa project.
Read moreRepairing of 2000 gpm pump 180m head
For complete repairing and overhauling of 2000 gpm pump 180 m head multi stage-4 horizontal turbine pump make-max flow sendra bansjora workshop under sijua area
Read moreof your Industry type