| Particulars | Details |
|---|---|
| Title |
General Beautification For New Block In Additional Construction Of Pwd Rest House Kozhikode Interlocking Side Retaining Wall Rr Laterite Masory Using Steel Section Modification Ceiling Work Etc General Civil Work
|
| Description |
Construction
|
| Organisation | Government of Kerala |
| Tender Id | 2023_PWD_619758_1 |
|
Reference Number |
59/EEBK/2023-24 |
| Tender Fee | 2760 |
| EMD | 34205 |
| Tender Value | - |
| Place | Buildings Division Kozhikode |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | November 07, 2023 23:30 |
| End Date |
Expired
15/11/2023
Expired 1070 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation or demolition works,inlet piping from terrace to rest room,outlet pipe from rest room to ground,removing and refixing of acp without scaffolding,other plumbing materials,plumbing labour,purchase of wc,fixing of wc,purchase of health faucet,fixing of health faucet,purchasing of wash basin,fixing of wash basin,purchasing of pipe,fixing of pipe,bison board fixing on rest room walls,floor rising of rest room,tile for floor,tiles for walls,door for rest room,false ceiling in rest room,electrical wiring for rest room,light for rest room,exhaust fan for rest room,fluted panel in the behind wall,relamination of wall panel,all ledges,tv unit storage,false ceiling,wiring for lights,track lights,electrical labour,roller blinds non-motorised,darker sun control film in glass windows,painting,wall panel behind marketing manager table,tv panel and ledges,wall panel in the behind wall,additional storages,electrical works shifting of socket pointing and concealing of cables and other related.,supply and installati
Preparation or demolition works,inlet piping from terrace to rest room,outlet pipe from rest room to ground,removing and refixing of acp without scaffolding,other plumbing materials,plumbing labour,purchase of wc,fixing of wc,purchase of health faucet,fixing of health faucet,purchasing of wash basin,fixing of wash basin,purchasing of pipe,fixing of pipe,bison board fixing on rest room walls,floor rising of rest room,tile for floor,tiles for walls,door for rest room,false ceiling in rest room,electrical wiring for rest room,light for rest room,exhaust fan for rest room,fluted panel in the behind wall,relamination of wall panel,all ledges,tv unit storage,false ceiling,wiring for lights,track lights,electrical labour,roller blinds non-motorised,darker sun control film in glass windows,painting,wall panel behind marketing manager table,tv panel and ledges,wall panel in the behind wall,additional storages,electrical works shifting of socket pointing and concealing of cables and other related.,supply and installati
Read moreMumbai division : provision of telecom facility in connection with 1. repairs and modification to operating infrastructure (ss/dy.ss office, guard rest room & swr room) at mumbai central, 2. repairs & renovation of tpc office at annex building, mumbai central, 3. improvement of platform surfacing of pf no. 1,2,3,4&5 with divyang tactile tiles, mumbai central 4. improvement to unsafe roof ceiling at mumbai central, 5. extension of platform no 4 for accommodation of 15 car emu at dad
Mumbai division : provision of telecom facility in connection with 1. repairs and modification to operating infrastructure (ss/dy.ss office, guard rest room & swr room) at mumbai central, 2. repairs & renovation of tpc office at annex building, mumbai central, 3. improvement of platform surfacing of pf no. 1,2,3,4&5 with divyang tactile tiles, mumbai central 4. improvement to unsafe roof ceiling at mumbai central, 5. extension of platform no 4 for accommodation of 15 car emu at dad
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreRemoving the existing fence fabrication of frame of size 200 ft by 4 ft and fixing 6 mm thick polycorbonate sheet on the frame using sellf tapping screws along the boundary of the park,straightening of backside fence and giving additional support wherever required,supply and installation of multi play station of size 33 ft by 18 ft,construction of 6 inch high retaining wall along the boundary of size 40 ft by 20 ft,leveling of ground for laying of artificial grass,laying of 50 mm thick artificial grass,cleaning refitting of wc and tank provision of 200 ltr loft tank with plumbing and construction of covered septic tank of 5 ft dia and 6 ft depth,supply and fitting of three seater bench,supply and installation of 8 ft high decorative garden lights
Removing the existing fence fabrication of frame of size 200 ft by 4 ft and fixing 6 mm thick polycorbonate sheet on the frame using sellf tapping screws along the boundary of the park,straightening of backside fence and giving additional support wherever required,supply and installation of multi play station of size 33 ft by 18 ft,construction of 6 inch high retaining wall along the boundary of size 40 ft by 20 ft,leveling of ground for laying of artificial grass,laying of 50 mm thick artificial grass,cleaning refitting of wc and tank provision of 200 ltr loft tank with plumbing and construction of covered septic tank of 5 ft dia and 6 ft depth,supply and fitting of three seater bench,supply and installation of 8 ft high decorative garden lights
Read morePwd rest house-construction of additional block of pwd rest house kozhikode - providing light fittings-general electrical work
Pwd rest house-construction of additional block of pwd rest house kozhikode - providing light fittings-general electrical work
Read moreGeneralgovt rest house kozhikode balance work balance work for the additional block of govt rest house kozhikodegeneral civil work
This estimate is prepared for the balance&#x0d finishing work of newly constructed additional&#x0d block of kozhikode rest house.
Read moreMinor modification and suitable re arranging of ceiling using acoustic panel and expansion of entrance for separation
Modification and suitable re arranging of ceiling using acoustic panel and expansion of entrance for separation at bdba hospital kandivali west