Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mangalam Project Ap 2023 24 Mangalam Canal Mace Jungle Clearance And Desilting Of Lbc From Ch 0 000 To 5 400 And Its Branches For 2023 24 Second Crop And 2024 First Crop
|
| Description |
Earth Work , Clearing Jungle, Engaging Hydraulic Excavator
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_598575_1 |
|
Reference Number |
1/IRR/PI/TR/6169/2023/MGM/ALR |
| Tender Fee | 750 |
| EMD | 8474 |
| Tender Value | |
| Place | Alathur |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | August 25, 2023 21:30 |
| End Date |
Expired
01/09/2023
Expired 1036 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mangalam project ap 2023 24 mangalam canal mace jungle clearance and desilting of rbc from ch 0 000 to 10 800 and its branches for 2023 24 second crop and 2024 first crop
Earth work, clearing jungle,engaging hydraulic excavator
Read moreMangalam project ap 2023 24 cs vdy clearing jungle and removing silt in between ch 5 400 to 17 600 km of lbmc including field channels for 2023 second crop and 2024 first crop
Earth work, clearing jungle, engaging hydraulic excavator
Read moreGeneral mp lbc es action plan 2023 24 annual maintenance of chulannur branch canal between ch 24_000 km to td and sub canals vavulliyapuram tarur pazhambalakkode for 2023 24 second crop and 2024 first crop general civil work
Engaging hydraulic excavator for earth work, engaging man mazdoor for canal cleaning jungle clearance and block removal
Read moreGeneral-mp- rbc-ap-2023-24-am-urgent desilting and removal of vegetative materials from palappuram branch canal in between ch. 0/000 km to 6/000 km for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of palappuram branch canal between ch 0/000 to 6/000 km for second crop and as and when required clearing and desilting mazdoor
Read moreGeneral-mp-rbc-ap-2023-24- am-urgent desilting and removal of vegetative materials from rb main canal between ch 26/000 km to 29/000 km for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of rb main canal from 20/000 to 26/000 km for second, first crops and as and when required,clearing and desilting
Read moreCheramangalam scheme ap 2023 24 canal cleaning work for cheramangalam scheme for 2023 24 second crop and 2024 first crop ch 0 000 to 8 400 km
Engaging hydraulic excavator, man mazdoor earth work, centering and shuttering cement concrete fixing handrail
Read moreMangalam project ap 2023 24 cs vdy clearing jungle and removing silt in between ch 17 600 to 23 400 km of lbmc including field channels for 2023 second crop and 2024 first crop
Earth work, clearing jungle, engaging hydraulic excavator
Read moreGeneral-kyip acp (np) 2023-24-clearing jungle and desilting of thiruvallur distributary canal from ch.0/000 km to 5/000 km-general civil work
Clearing jungle and desilting of thiruvallur distributary canal from ch.0/000 km to 5/000 km
Read moreGeneral-mp-rbc- ap-2023-24- annual maintenance-urgent desilting removal of vegetation, vegetative material from rbmc between ch 10/000 km to 14/000 km for 2023- 24 second crop and 2024 first crop-general civil work
Cleaning of rbmc from 10/000 to 14/000 km for second, first crops and as and when required clearing desilting
Read moreGeneral-mp-rbc-ap- 2023-24-annual maintenance -urgent desilting removal of vegetation vegetative material from rbmc between ch 14/000 km to 17/000 km for 2023- 24 second crop and 2024 first crop-general civil work
Cleaning of rbmc from 14 000 to 17 000 km for second, first crops and as and when required, desilting,clearing
Read moreof your Industry type