Tender Details
Particulars | Details |
---|---|
Title |
General Ap 2024 25 Mangalam Project Dam Section Jungle Clearance And De Silting Of Rbc From Ch 0 000 To 10 800 Km And Its Branches
|
Description |
General Ap 2024 25 Mangalam Project &Amp#X0d
Dam Section Jungle Clearance And De Silting Of&Amp#X0d
Rbc From Ch 0 000 To 10 800 Km And Its&Amp#X0d
Branches
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_694943_1 |
Reference Number |
10-IRR/PI/TR/3410/2024_5_2_1/1 |
Tender Fee | 1495 |
EMD | 16945 |
Tender Value | |
Place | ALATHUR |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1083093 |
Start Date | October 07, 2024 22:30 |
End Date |
10/10/2024 ( Expired 231 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreConstruction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Read moreRehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreRehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost
Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreIndependent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Read moreDensification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.294.000 to km.377.000 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Densification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.294.000 to km.377.000 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreGeneral- one time maintenance 2024-25-attingal town bypass in kadambattukonam - kazhakuttom section of nh-66 - length - 10.6 km - from manamboor ch.527/500 to mamom ch.538/100
This work is for otm works in attingal town bypass in kadambattukonam - kazhakuttom section of nh-66, from manamboor ch.527/500 to mamom ch.538/10, for a length of 10.60 km. and the work includes items such as wmm, dgbm, bc, traffic safety works etc.
Read moreof your Industry type