Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rubble Masonry Wall Back Side Of Mt 25 Mtr And Near Gate No 01 35 Mtr Of Gc Crpf Nagpur.
|
| Description |
Rubble Masonry Wall Back Side Of Mt 25 Mtr And Near Gate No 01 35 Mtr Of Gc Crpf Nagpur.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_CRPF_771306_1 |
|
Reference Number |
B.V-4/2022-23-SZ-Works (GC NGR)T/009 |
| Tender Fee | 0 |
| EMD | 18900 |
| Tender Value | - |
| Place | Online at South Zone HQr CRPF |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | September 13, 2023 15:30 |
| End Date |
Expired
20/09/2023
Expired 1124 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair / maintenance and painting of campus boundary wall main gate no-01 to gate no-03 (total lengh-1364 mtr) at rtc crpf, rajgir
Repair / maintenance and painting of campus boundary wall main gate no-01 to gate no-03 (total lengh-1364 mtr
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreView cutter for main office gate size 17 ft x 7 ft,view cutter for main office side gate size 9 ft x 4 ft,perforated jalli,hardware design,bar 12mm,installation and labour charges,labour charges for painting of gate,view cutter for mt gate size 17x7,fitting of perforated jalli,hardware etc,ms pipe 2x2,bar 12mm,installation and labour charges,labour charges for painting of gate,view cutter for rear gate size 17x7,view cutter for quarter guard gate size 8x4,view cutter for near cook house gate size 13x7,hardware design,installation and labour charges,labour charges for painting of gate,view cutter for office front area partition,ms pipe 1 and half inch,self screw,labour charges,view cutter for office back side area,ms pipe 1 x 1 inch 16 gauge,ms pipe 1 point 5 x 1 point 5 inch 16 gauge,ms pipe 3 x 3 inch 16 gauge,self screw,dust,khadi,cement,installation and labour charges
View cutter for main office gate size 17 ft x 7 ft,view cutter for main office side gate size 9 ft x 4 ft,perforated jalli,hardware design,bar 12mm,installation and labour charges,labour charges for painting of gate,view cutter for mt gate size 17x7,fitting of perforated jalli,hardware etc,ms pipe 2x2,bar 12mm,installation and labour charges,labour charges for painting of gate,view cutter for rear gate size 17x7,view cutter for quarter guard gate size 8x4,view cutter for near cook house gate size 13x7,hardware design,installation and labour charges,labour charges for painting of gate,view cutter for office front area partition,ms pipe 1 and half inch,self screw,labour charges,view cutter for office back side area,ms pipe 1 x 1 inch 16 gauge,ms pipe 1 point 5 x 1 point 5 inch 16 gauge,ms pipe 3 x 3 inch 16 gauge,self screw,dust,khadi,cement,installation and labour charges
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreRubble masonry wall of gc crpf nagpur
Rubble masonry wall back side of mt 25 mtr and near gate no 1 35 mtr of gc crpf nagpur
Read moreRepair of composite hospital at gc crpf nagpur
Repair of composite hospital at gc crpf nagpur
Read moreRepairing and painting of composite hospital mess at gc, crpf, nagpur maharashtra
Repairing and painting of composite hospital mess at gc, crpf, nagpur maharashtra
Read moreRepair of nissan hut 01 number 28 mtr x 10 mtr at gc, crpf, bengalore karnataka
Repair of nissan hut 01 number 28 mtr x 10 mtr at gc, crpf, bengalore karnataka
Read moreRepairing of washing point of mt at gc crpf bhubaneswar, nayapalli-751011
Repairing of washing point of mt at gc crpf bhubaneswar, nayapalli-751011
Read moreRepairing and maintenance of mt park at gc-2 crpf,ajmer (raj.)
Repairing and maintenance of mt park at gc-2 crpf,ajmer (raj.)
Read moreof your Industry type