Tender Details

Particulars Details
Title
Custom Bid For Services Road Transportation Of Component Like Bogie Wheel Sets Etc By Trailer Tru
Description
Organisation Indian Railways | Ministry of Railways
Tender Id GEM/2023/B/4161271
Reference
Number
-
Tender Fee -
EMD -
Tender Value 2 Crore
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date November 02, 2023 18:01
End Date
Expired 23/11/2023

Expired 1053 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

SHREE J.B. GRAIN DEALERS ASSOCIATION

Contract Value

53010830.23

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 266 Lakhs Experience with Gov. Required: Years Project Experience Required: No
Buyer Name: Shishir Chandra Shekhar
Ministry: Ministry Of Railways
Department: Indian Railways
Organisation: East Central Railway

Technical Evaluation Results

S.No. Seller Name Participated On EMD Status MSE/MII Status Status
1 ACC LOGISTICS 23-11-2023 12:19:16 Registered with designated Agency / Authority MSE Disqualified
2 Fast Track Tour and Travels 22-11-2023 16:51:10 Registered with designated Agency / Authority MSE Qualified
3 KARNANI CONSTRUCTIONS 23-11-2023 12:06:45 Registered with designated Agency / Authority MSE Disqualified
4 MANASHI SERVICES 23-11-2023 12:27:55 Registered with designated Agency / Authority N/A Disqualified
5 SCC LOGISTIC SOLUTION 05-11-2023 12:15:05 Registered with designated Agency / Authority MSE Disqualified
6 SHREE J.B. GRAIN DEALERS ASSOCIATION 22-11-2023 12:26:02 MSE MSE Qualified
7 SHRI KRISHNA ROAD CARRIER 22-11-2023 18:03:02 MSE MSE Qualified
8 TRANSPORT CORPORATION OF INDIA LIMITED 22-11-2023 12:54:48 Turnover >= 500 Cr. N/A Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 SHREE J.B. GRAIN DEALERS ASSOCIATION( MSE Social Category:General ) Item Categories : Custom Bid for Services - Road transportation of component like bogie wheel sets etc by trailer tru 53010830.23 L1
2 SHRI KRISHNA ROAD CARRIER( MSE Social Category:General ) Item Categories : Custom Bid for Services - Road transportation of component like bogie wheel sets etc by trailer tru 56302909.00 L2
3 Fast Track Tour and Travels Item Categories : Custom Bid for Services - Road transportation of component like bogie wheel sets etc by trailer tru 57790707.76 L3
4 TRANSPORT CORPORATION OF INDIA LIMITED Item Categories : Custom Bid for Services - Road transportation of component like bogie wheel sets etc by trailer tru 99977251.00 L4

Ordered Items & Contract Pricing

Service Category Name Ordered Quantity Price
Custom Bid for Services - Road transportation of component like bogie wheel sets etc by trailer truck from to various depots of Samastipur division to from Gorakhpur Harnaut Alambagh and other workshop PU depots for three years Custom Bid for Services 1 ₹ 47696052.930
Custom Bid for Services - Loading and unloading of components like bogie wheel sets etc at depots of SPJ division Custom Bid for Services 1 ₹ 5314777.300
Similar Tenders
Supply and installation of various finishing work items like false ceiling, cnc cutting, upvc/glass windows and doors, acp work etc. in patna zoo

Supply and installation of various finishing work items like false ceiling, cnc cutting, upvc/glass windows and doors, acp work etc. in patna zoo

Read more
Online bids are invited from registered indian firms/agencies {manufacturers (oems)/ authorized distributors/ dealers/ suppliers/ fabricators} for the supply and installation of various finishing work items like false ceiling, cnc cutting, upvc/glass windows and doors, acp work etc. in patna zoo.

Online bids are invited from registered indian firms/agencies {manufacturers (oems)/ authorized distributors/ dealers/ suppliers/ fabricators} for the supply and installation of various finishing work items like false ceiling, cnc cutting, upvc/glass windows and doors, acp work etc. in patna zoo.

Read more
Door to door collection, segregation of municipal solid waste (msw) from each residential and commercial establishments, drain cleaning & transportation to the transfer stations/processing site inculding manual road sweeping etc. in municipal corporation, bhagalpur for four (4) years from ward no. 1 to ward no. 51.

Door to door collection, segregation of municipal solid waste (msw) from each residential and commercial establishments, drain cleaning & transportation to the transfer stations/processing site inculding manual road sweeping etc. in municipal corporation, bhagalpur for four (4) years from ward no. 1 to ward no. 51.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise