Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbiw/Ee/Puapwi001/E Nit07/23 24
|
| Description |
Rehabilitation Of Dam Part Of Dangra Irrigation Project Within Ps And Block Kashipur, Dist Purulia
|
| Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
| Tender Id | 2024_IWD_665018_1 |
|
Reference Number |
WBIW/EE/PUAPWI001/eNIT07/23-24 |
| Tender Fee | 0 |
| EMD | 1.21 Lakh |
| Tender Value | - |
| Place | KASHIPUR |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1441924 |
| Start Date | February 12, 2024 16:30 |
| End Date |
Expired
28/02/2024
Expired 950 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreWbiw/ee/puapwi001/enit06/23-24
Temporary guarding arrangement by private security guards in tatko dam and spillway including tatko field hostel campus, block-bandwan, district-purulia.
Read moreWbiw/ee/puapwi001/enit5/23-24
M/r to road bridge at ch. 62 and ch. 78 of rbmc in c/w taragonia (i) scheme under purulia investigation and planning division.
Read moreWbiw/ee/puapwi001/enit4/23-24
Emergent repair of road embankment by providing guard wall at top of off-take point at dy-4 of l.b.m.c in c/w lipania (i) scheme.
Read moreWbiw/ee/puapwi001/enit4/23-24
M/r to taragonia spillway d/s protection work in c/w taragonia (i) scheme.
Read moreWbiw/ee/puapwi001/enit4/23-24
Up keeping of field hostel and peripheral area under dangra (i) scheme under p.i.p.d during the period 2023-24
Read moreWbiw/ee/puapwi001/enit4/23-24
M/r to cd at ch-1300.00 m, 1550.00 m and 2550 m and silt clearance in between ch 0.0 m and 2800 m of rbmc in c/w tatko (i) scheme.
Read moreWbiw/ee/puapwi001/enit4/23-24
Emergent repair of dam dyke road including approach road in c/w moutorejore (i) scheme.
Read moreWbiw/ee/puapwi001/enit4/23-24
Silt clearance of rbmc from ch. 0.00m to ch.1200.00m, ch.1400.0m to ch.2100.0 m, ch. 2500.0m to ch.3000.0m, ch.3400.0m to ch.4190.0m of dangra (i) scheme under purulia investigation and planning division.
Read moreWbiw/ee/puapwi001/enit4/23-24
Emergent repair of dam dyke road in between ch.0 m to ch. 800 m in c/w lipania dam under p.i.p.d at block- para , district-purulia.
Read moreof your Industry type