Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Infrastructure Facilities For Coastal Surveillance System At Alleppey (Kerala), Balance Work Package 5 (Phase Ii).
|
| Description |
Infrastructure Facilities For Coastal Surveillance System At Alleppey (Kerala), Balance Work Package 5 (Phase Ii).
|
| Organisation | Bharat Electronics Limited | Public Sector Undertakings |
| Tender Id | 2024_BEL_95136_1 |
|
Reference Number |
06/000019/2024 |
| Tender Fee | 0 |
| EMD | 1.04 Lakh |
| Tender Value | |
| Place | BEL, Bangalore |
| Link |
View Original Tender Notice
eprocurebelgsl.nic.in?page=FrontEndTenderDetailsExternal&service=page&tnid=104583 |
| Start Date | June 19, 2024 18:30 |
| End Date |
Expired
29/06/2024
Expired 717 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 17 nos. forward bops (14 nos. company level and 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. sh:- c/o 2 nos. company level bop at simna-ii and old sewaram para including internal electrification, installation i/c compound lights service connecton to buildings. (package-ii) (balance work)
Read moreConstruction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Construction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Read moreBalance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Balance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Read moreWork contract for aoh coh of non pressure parts of boiler of ph i and ph ii during fy 2026 27 at sgtps, mppgcl, birsinghpur
Work contract for aoh coh of non pressure parts of boiler of ph i and ph ii during fy 2026 27 at sgtps, mppgcl, birsinghpur
Read moreProvn of view cutter above perimeter wall near trainees block pathway near nda cadet mess chequered tiles at certain places pathway with shed for ueb hall t 616 and t 617 work station at certain location
Provn of view cutter above perimeter wall near trainees block pathway near nda cadet mess chequered tiles at certain places pathway with shed for ueb hall t 616 and t 617 work station at certain location at aftc and afs jalahalli
Read moreInfrastructure facilities for coastal surveillance system at beypore (kerala), balance work - package-5 (phase-ii).
Infrastructure facilities for coastal surveillance system at beypore (kerala), balance work - package-5 (phase-ii).
Read moreInfrastructure facilities for coastal surveillance system at kadalur (kerala), balance work - package-5 (phase-ii).
Infrastructure facilities for coastal surveillance system at kadalur (kerala), balance work - package-5 (phase-ii).
Read moreInfrastructure facilities for coastal surveillance system at azhikode (kerala), balance work - package-5 (phase-ii).
Infrastructure facilities for coastal surveillance system at azhikode (kerala), balance work - package-5 (phase-ii).
Read moreInfrastructure facilities for coastal surveillance system at kasargod (kerala), package-5 (phase-ii).
Infrastructure facilities for coastal surveillance system at kasargod (kerala), package-5 (phase-ii).
Read moreInfrastructure facilities for coastal surveillance system phase ii, arkuda, orissa.
Infrastructure facilities for coastal surveillance system phase ii, arkuda, orissa.
Read moreof your Industry type