Tender Details

Particulars Details
Title
Extended Modular Computer Lab With Chair
Description
Organisation Higher Education Department Odisha |
Tender Id GEM/2024/B/4757434
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date March 09, 2024 17:17
End Date
Expired 19/03/2024

Expired 926 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 146 Lakhs Experience with Gov. Required: Years
Buyer Name: Netajee Abhinandan
Department: Higher Education Department Odisha
Organisation: Ravenshaw University Cuttack

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 Furniture world Make : METHODEX Model : Methodex Modular Computer Lab With Chair B 4757434 Title : Methodex Modular Computer Lab With Chair B 4757434 19-03-2024 11:18:35 MII Qualified
2 MERCANTILE SYSTEMS Make : METHODEX Model : METHODEX Modular Computer Lab with ChairB4757434 Title : METHODEX Modular Computer Lab with Chair NS B4757434 ODISHA 19-03-2024 11:02:36 MII Qualified
3 METHODEX SYSTEMS PRIVATE LIMITED Make : METHODEX Model : METHODEX Computer Lab with Chair NS B4757434 Title : METHODEX Computer Lab with Chair NS B4757434 19-03-2024 10:10:40 MII Qualified
4 SRSK & COMPANY Make : SRSK.COMPANY Model : SRSK.COMPANY Modular Computer Lab With Chair Title : SRSK. COMPANY Modular Computer Lab With Chair 19-03-2024 11:45:22 N/A Disqualified
Similar Tenders
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds

Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise