Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
8426090174,First Year Pwcamc,Second Year Pwcamc,Third Year Pwcamc,Fourth Year Pwcamc,Fifth Year Pwc
|
| Description |
|
| Organisation | CHENNAI PETROLEUM Corporation Limited | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5696212 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | December 12, 2024 16:57 |
| End Date |
Expired
23/12/2024
Expired 661 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Read moreMulti energy x-ray baggage scanner,,3, kva, on line ups,1.5 tr inverter split ac,instal. and comm. of xbis and associated accessories,camc for first year,camc for second year,camc for third year,camc for fourth year,camc for fifth year
Multi energy x-ray baggage scanner,,3, kva, on line ups,1.5 tr inverter split ac,instal. and comm. of xbis and associated accessories,camc for first year,camc for second year,camc for third year,camc for fourth year,camc for fifth year
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreSterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Read moreTender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Read morePms _first year,first visit,pms _first year,second visit,pms _second year,first visit,pms _second year,second visit,pms _third year,first visit,pms _third year,second visit,bd visit_first year,first visit,bd visit_first year,second visit,bd visit_second year,first visit,bd visit_second year,second visit,bd visit_third year,first visit,bd visit_third year,second visit
Pms _first year,first visit,pms _first year,second visit,pms _second year,first visit,pms _second year,second visit,pms _third year,first visit,pms _third year,second visit,bd visit_first year,first visit,bd visit_first year,second visit,bd visit_second year,first visit,bd visit_second year,second visit,bd visit_third year,first visit,bd visit_third year,second visit
Read moreSupply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Supply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Read moreSupply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreDesign and supply of mounting of module structures, pv module for 198 kwp solar plant,site development, design, engineering, construction, erection, testing and commissioning of the 198 kwp solar plant,price for o and m cum amc for first year,price for o and m cum amc for second year,price for o and m cum amc for third year,price for o and m cum amc for fourth year,price for o and m cum amc for fifth year
Design and supply of mounting of module structures, pv module for 198 kwp solar plant,site development, design, engineering, construction, erection, testing and commissioning of the 198 kwp solar plant,price for o and m cum amc for first year,price for o and m cum amc for second year,price for o and m cum amc for third year,price for o and m cum amc for fourth year,price for o and m cum amc for fifth year
Read moreof your Industry type