Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of 50 T, Asec Make Electronic Road Weighbridge By Replacement Of Complete Load Cell Mounting Accessories Of Wb No. 03, Junction Board Of Wb No. 01 And Window Display Of Wb No. 01 And 03 Installed At Tapin South Ocp
|
| Description |
Repairing Of 50 T, Asec Make Electronic Road Weighbridge By Replacement Of Complete Load Cell Mounting Accessories Of Wb No. 03, Junction Board Of Wb No. 01 And Window Display Of Wb No. 01 And 03 Installed At Tapin South Ocp
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_290233_1 |
|
Reference Number |
PO/TSOCP/EnM/e Tender/23-24/11 |
| Tender Fee | - |
| EMD | 1300 |
| Tender Value | - |
| Place | Tapin South OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 04, 2023 16:30 |
| End Date |
Expired
14/10/2023
Expired 1051 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General stall no.03 chikkamshi hosur bus stand size 119.97 sqft.vacant as on dt 09-01-2027
Mlf rs 5932 emd rs 17796 area 119.97 sqft vacant as on dt 09-01-2027
Read moreConstruction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Construction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Read moreBeautification of the t-junction near the punawan-barahi pahad bypass turn in ward no. 01 (at the intersection of punawan dakshin-gaon road and the gaya-nawada bypass road).
Beautification of the t-junction near the punawan-barahi pahad bypass turn in ward no. 01 (at the intersection of punawan dakshin-gaon road and the gaya-nawada bypass road).
Read moreRepairing and rewinding of 01 no. ac slipping motor 31 kw, 415/440v, 978 rpm and repairing (capacity 40t and 5t) eot (electrical overhead traveling) crane and repairing and fabrication of damaged incoming 03 phase line assembly rail and platform of
Repairing and rewinding of 01 no. ac slipping motor 31 kw, 415/440v, 978 rpm and repairing (capacity 40t and 5t) eot (electrical overhead traveling) crane and repairing and fabrication of damaged incoming 03 phase line assembly rail and platform of
Read moreRepairing of 50t road weighbridge make-asec (wb no.-03), installed near pit office of tapin south ocp under hazaribagh area.
Repairing of 50t road weighbridge make-asec (wb no.-03), installed near pit office of tapin south ocp under hazaribagh area.
Read moreCleaning the platform of weighbridge putting/replacing 1250 pcs test weight 20kg each during calibration of 03 wb (asec-50t, digital -50t, everlast-100t) installed at tapin north ocp for a period of 01 year to calibrate each weighbridge at tnocp
Cleaning the platform of weighbridge putting/replacing 1250 pcs test weight 20kg each during calibration of 03 wb (asec-50t, digital -50t, everlast-100t) installed at tapin north ocp for a period of 01 year to calibrate each weighbridge at tnocp
Read moreModification of 50t capacity asec make road weigh bridge structure at tapin north ocp under hazaribagh area.
Modification of 50t capacity asec make road weigh bridge structure at tapin north ocp under hazaribagh area.
Read moreInstallation of 04 no load cells, mother board, junction board of 50t cap asec make electronic road weigh bridge installed at tapin north ocp , under hazaribagh area
Installation of 04 no load cells, mother board, junction board of 50t cap asec make electronic road weigh bridge installed at tapin north ocp , under hazaribagh area
Read moreRepairing n fabrication of platform structure of 50t capacity asec make road weigh bridge at tapin north ocp under hazaribagh area.
Repairing n fabrication of platform structure of 50t capacity asec make road weigh bridge at tapin north ocp under hazaribagh area.
Read moreComplete overhauling, repairing of 50t cap. asec make electronic road weighbridge by replacement of load cell, load cell mounting, display, elastomers etc. installed at tapin north ocp under hazaribagh area.
Complete overhauling, repairing of 50t cap. asec make electronic road weighbridge by replacement of load cell, load cell mounting, display, elastomers etc. installed at tapin north ocp under hazaribagh area.
Read moreof your Industry type