Tender Details

Particulars Details
Title
Complete Overhauling, Repairing Of 50 T Cap. Asec Make Electronic Road Weighbridge By Replacement Of Load Cell, Load Cell Mounting, Display, Elastomers Etc. Installed At Tapin North Ocp Under Hazaribagh Area.
Description
Complete Overhauling, Repairing Of 50 T Cap. Asec Make Electronic Road Weighbridge By Replacement Of Load Cell, Load Cell Mounting, Display, Elastomers Etc. Installed At Tapin North Ocp Under Hazaribagh Area.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_335673_1
Reference
Number
PE(EnM)/TNOCP/Tender/25-26/05
Tender Fee 0
EMD 3000
Tender Value
Place Tapin North OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347972
Start Date May 19, 2025 22:30
End Date

29/05/2025 ( Expired 31 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of 100 te road weighbridge make- ashoka metal local sr. no. 09 installed at kargali siding under karo o.c.p., bnk area

Repairing of 100 te road weighbridge make- ashoka metal local sr. no. 09 installed at kargali siding under karo o.c.p., bnk area

Read more
Maintenance and upgradation of wb no. 02 road weighbridge which includes load cell replacement, digitizer repair/replacement, and jb card replacement, etc. at jocp, hzb area.

Maintenance and upgradation of wb no. 02 road weighbridge which includes load cell replacement, digitizer repair/replacement, and jb card replacement, etc. at jocp, hzb area.

Read more
Comprehensive annual maintenance contract (camc) including repairing of digitiser and replacement of load cell digital make electronic road w/b 50te capacity installed at zero point sl. no. 201804008 and check post sl. no.101141748 of gvp phase-ii o

Comprehensive annual maintenance contract (camc) including repairing of digitiser and replacement of load cell digital make electronic road w/b 50te capacity installed at zero point sl. no. 201804008 and check post sl. no.101141748 of gvp phase-ii o

Read more
Repairing maintenance and complete overhauling of 01 no 1000 gpm, 150 mtr head, multistage plurovan ii model, m and p make pump sl. no-81002724/10/12 at parej east open cast project hazaribagh area.

Repairing maintenance and complete overhauling of 01 no 1000 gpm, 150 mtr head, multistage plurovan ii model, m and p make pump sl. no-81002724/10/12 at parej east open cast project hazaribagh area.

Read more
Repairing rectification and full overhauling with spares of 1000 gpm 100 mh model 8-8 dme, mnp make pump assembly at tapin north open cast project hazaribagh area.

Repairing rectification and full overhauling with spares of 1000 gpm, 100 mh, model 8-8 dme,mnp make pump assembly at tapin north open cast project hazaribagh area.

Read more
Repairing n replacement of top damaged and torn plate as per requirement of top damaged an torn plate as per requirement and also of its supporting girder of platform (9 x 4.5 m) of road weighbridge-10 capacity 60 mt installed at magadh ocp under m-

Repairing n replacement of top damaged and torn plate as per requirement of top damaged an torn plate as per requirement and also of its supporting girder of platform (9 x 4.5 m) of road weighbridge-10 capacity 60 mt installed at magadh ocp under m-

Read more
(1) complete repairing and overhauling of shaper machine (2) replacement renovation of fabrication crossing pipes road at different places at west sump and haul road (10in) akwmc ocp at katras area.(3) fabrication of

(1) complete repairing and &#x0d overhauling of shaper &#x0d machine (2) &#x0d replacement renovation &#x0d of &#x0d fabrication &#x0d crossing &#x0d pipes &#x0d road &#x0d at &#x0d different places at west &#x0d sump and haul road (10in) &#x0d akwmc ocp at katras &#x0d area.(3) fabrication of

Read more
Repairing of h.t panel, ht panel box with mounting, replacement/repairing of complete wiring harness and corresponding electrical devices of ck300 shovel e172 deployed at topa ocp, kuju area.

Repairing of h.t panel, ht panel box with mounting, replacement/repairing of complete wiring harness and corresponding electrical devices of ck300 shovel e172 deployed at topa ocp, kuju area.

Read more
Onsite overhauling and repairing of the transformer 3.3 kv by 440 v, 100 kva, name plate missing transformer installed at the substation under karo ocp, bnk area.

Onsite overhauling and repairing of the transformer 3.3 kv by 440 v, 100 kva, name plate missing transformer installed at the substation under karo ocp, bnk area.&#x0d

Read more
Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area

Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise