Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Laying Rcc Pipeline From Slum Area Near
|
| Description |
Providing And Laying Rcc Pipeline From Slum Area Near&Amp#X0d
Chhatrapati Shivaji Maharaj Stadium To Shri Shinde House Budhwar Peth&Amp#X0d
Karad
|
| Organisation | Directorate Of Municipal Administration | State Govt. and UT |
| Tender Id | 2024_DMA_1011332_2 |
|
Reference Number |
Civil-114/2023-24 |
| Tender Fee | 3540 |
| EMD | 19916 |
| Tender Value | |
| Place | Karad Municipal Council |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1768820 |
| Start Date | February 21, 2024 20:30 |
| End Date |
Expired
28/02/2024
Expired 874 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
Read moreUpgradation of power line at ind. area boranada ph-iv and epipi
Upgradation of power line at ind. area boranada ph-iv and epipi
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreProviding and fitting of wood works, electrical works and other works for operators room at sccr kupwara.
Providing and fitting of wood works, electrical works and other works for operators room at sccr kupwara.
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreCuddalore corporation - providing / generating / creating 2d / 3d maps using lidar and multi oblique angle 4 oblique plus 1 nadir camera using drone and dgps technology in all 45 wards of cuddalore city municipal corporation
Cuddalore corporation - providing / generating / creating 2d / 3d maps using lidar and multi oblique angle 4 oblique plus 1 nadir camera using drone and dgps technology in all 45 wards of cuddalore city municipal corporation &#x0d
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreNit no 01 work no 01
Door to door collection of waste in all wards 1 to 25 for three years iot based door to door coolection of waste from all residential establishment and commerical establishemnt in both day and night shift of municipal board asind bhilwara rajastahn
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreof your Industry type