Tender Details

Particulars Details
Title
Wbpwd/Ss/Ee/Pur/Nit 13/2024 25
Description
Repair And Renovation Of Ground Floor And Finishing With Tiles And Other Ancillary Works At The Office Of The Agricultural Chemist Soil Testing Laboratory In The District Of Purulia
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2025_WBPWD_814328_3
Reference
Number
WBPWD/SS/EE/PUR/NIT-13/2024-25
Tender Fee 0
EMD 23557
Tender Value -
Place PURULIA
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1810970

Start Date February 12, 2025 15:30
End Date
Expired 17/03/2025

Expired 582 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Civil works for ground floor of referral laboratory beside admin building, lalapet, hyderabad

Civil works for ground floor of referral laboratory beside admin building, lalapet, hyderabad

Read more
Civil works for ground floor of referral laboratory beside admin building lalpet ,hyderbad of

Civil works for ground floor of referral laboratory beside admin building lalpet ,hyderbad of

Read more
Providing of electricals and air conditioners works for ground floor of referral laboratory beside admin building lalapet

Providing of electricals and air conditioners works for ground floor of referral laboratory beside admin building lalapet

Read more
Providing of electricals and air conditioners works for ground floor of referral laboratory beside admin building, lalapet, hyderabad.

Providing of electricals and air conditioners works for ground floor of referral laboratory beside admin building, lalapet, hyderabad.

Read more
Carrying of civil and mechanical works for shifting of pv section to ground floor of hangar 1 west ancillary bldg at aiesl engg premises oap, mumbai 400029

Carrying of civil and mechanical works for shifting of pv section to ground floor of hangar 1 west ancillary bldg at aiesl engg premises oap, mumbai 400029

Read more
Providing and fixing external vitrified floor tiles at ground floor corridor, natural stone flooring at porch, fixing pvc gutter to existing gi sheet roofing sheet and other allied works at aneexe building, cpmg office, trivandrum.

Providing and fixing external vitrified floor tiles at ground floor corridor, natural stone flooring at porch, fixing pvc gutter to existing gi sheet roofing sheet and other allied works at aneexe building, cpmg office, trivandrum.

Read more
Preparation or demolition works,inlet piping from terrace to rest room,outlet pipe from rest room to ground,removing and refixing of acp without scaffolding,other plumbing materials,plumbing labour,purchase of wc,fixing of wc,purchase of health faucet,fixing of health faucet,purchasing of wash basin,fixing of wash basin,purchasing of pipe,fixing of pipe,bison board fixing on rest room walls,floor rising of rest room,tile for floor,tiles for walls,door for rest room,false ceiling in rest room,electrical wiring for rest room,light for rest room,exhaust fan for rest room,fluted panel in the behind wall,relamination of wall panel,all ledges,tv unit storage,false ceiling,wiring for lights,track lights,electrical labour,roller blinds non-motorised,darker sun control film in glass windows,painting,wall panel behind marketing manager table,tv panel and ledges,wall panel in the behind wall,additional storages,electrical works shifting of socket pointing and concealing of cables and other related.,supply and installati

Preparation or demolition works,inlet piping from terrace to rest room,outlet pipe from rest room to ground,removing and refixing of acp without scaffolding,other plumbing materials,plumbing labour,purchase of wc,fixing of wc,purchase of health faucet,fixing of health faucet,purchasing of wash basin,fixing of wash basin,purchasing of pipe,fixing of pipe,bison board fixing on rest room walls,floor rising of rest room,tile for floor,tiles for walls,door for rest room,false ceiling in rest room,electrical wiring for rest room,light for rest room,exhaust fan for rest room,fluted panel in the behind wall,relamination of wall panel,all ledges,tv unit storage,false ceiling,wiring for lights,track lights,electrical labour,roller blinds non-motorised,darker sun control film in glass windows,painting,wall panel behind marketing manager table,tv panel and ledges,wall panel in the behind wall,additional storages,electrical works shifting of socket pointing and concealing of cables and other related.,supply and installati

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Floor finishing work using vitrified tiles in second floor of post harvest technology building at coa vellayani

Floor finishing work using vitrified tiles in second floor of post harvest technology building at coa vellayani

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise