Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Fabrication Of Structure For Strengthening Of Cgi Shed
|
| Description |
Design And Fabrication Of Structure For Strengthening Of Cgi Shed
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_IFC_217052_1 |
|
Reference Number |
enit no MICD/J/16 dated 16/06/2023 |
| Tender Fee | 300 |
| EMD | 90000 |
| Tender Value | - |
| Place | O/o Executive Engineer MICD Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | June 21, 2023 22:30 |
| End Date |
Expired
29/06/2023
Expired 1163 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Electrical work for 11 tpd mrf centre (material recovery facility) of peb structure (primary & secondary shed) at basavakalyan
Electrical work for 11 tpd mrf centre (material recovery facility) of peb structure (primary & secondary shed) at basavakalyan
Read moreConstruction of prefabricated structure for 3rd floor nursing college building at igims, patna
Construction of prefabricated structure for 3rd floor nursing college building at igims, patna
Read moreProviding consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Read moreDg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Dg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Read moreShort term tender notification for supply of sunboards and mounting hoarding structure at ayshman arogya kendra, district health and family welfare society,davanagere
Short term tender notification for supply of sunboards and mounting hoarding structure at ayshman arogya kendra, district health and family welfare society,davanagere
Read moreConstruction of retaining wall around mrf shed and processing shed in swm site of cmc ramanagara harisandra
Construction of retaining wall around mrf shed and processing shed in swm site of cmc ramanagara harisandra
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreConstruction of swm vehical shed work under harugeri tmc limit
Construction of swm vehical shed work under harugeri tmc limit
Read moreRequest for proposal (rfp) for selection of a system integrator for design, development, implementation and maintenance of unified single window system web portal and mobile application of invest bihar portal for department of industries
Request for proposal (rfp) for selection of a system integrator for design, development, implementation and maintenance of unified single window system web portal and mobile application of invest bihar portal for department of industries
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreof your Industry type