Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Raising Of Central Store Boundary Wall Up To 8 Feet Of Uihep, Mukhiguda.
|
Description |
Raising Of Central Store Boundary Wall Up To 8 Feet Of Uihep, Mukhiguda.
|
Organisation | Government of Odisha |
Tender Id | 2023_OHPCL_90820_1 |
Reference Number |
e-TCN-20/2023-24 dated.17.07.2023 |
Tender Fee | 4720 |
EMD | 9700 |
Tender Value | |
Place | O/o the Sr. General Manager(El),UIHEP,Mukhiguda |
Link | https://tendersodisha.gov.in |
Start Date | July 24, 2023 15:30 |
End Date |
04/08/2023 ( Expired 681 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConsultancy services for authority engineer for supervision of up-gradation of pichhore-dinara section of nh-346 from km 292.750 to 334.550 to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Consultancy services for authority engineer for supervision of up-gradation of pichhore-dinara section of nh-346 from km 292.750 to 334.550 to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreof your Industry type