Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Echp I Replacing The Existing Worn Out Bend Chutes By New Bend Chutes For Pc 1 A 1 B At Pch I.
|
| Description |
Echp I Replacing The Existing Worn Out Bend Chutes By New Bend Chutes For Pc 1 A 1 B At Pch I.
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_473674_1 |
|
Reference Number |
CE/SE/MI/TTPS/107/2024-2025 |
| Tender Fee | 0 |
| EMD | 3300 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=562711 |
| Start Date | August 16, 2024 23:30 |
| End Date |
Expired
02/09/2024
Expired 776 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Echp-i- replacing the existing wornout skirt board assembly by new skirt board assembly for conveyor-43 at pch-i.
Echp-i- replacing the existing wornout skirt board assembly by new skirt board assembly for conveyor-43 at pch-i.
Read more1. reliability improvement of signalling gears by replacement of defective cables, new battery charging, new point installation and replacement of worn-out signal posts, point machine components, codal life expired cpu & vdu s and dataloggers pc s, relays, tools and spares. 2. provision of class a surge protection and augmentation and reliability improvement of central datalogger system at vskp and reliability improvement of msdac and ips system components installed o
1. reliability improvement of signalling gears by replacement of defective cables, new battery charging, new point installation and replacement of worn-out signal posts, point machine components, codal life expired cpu & vdu s and dataloggers pc s, relays, tools and spares. 2. provision of class a surge protection and augmentation and reliability improvement of central datalogger system at vskp and reliability improvement of msdac and ips system components installed o
Read moreEchp-i- replacing the existing worn out support wheel assembly by new support wheel assembly for pc-1b at pch-i.
Echp-i- replacing the existing worn out support wheel assembly by new support wheel assembly for pc-1b at pch-i.
Read moreTtps- echp-i- replacing the existing worn out driven sprocket pcd-2450mm, drive sprocket and roller simplex chain by new for pc-1b at pch-i.
Ttps- echp-i- replacing the existing worn out driven sprocket pcd-2450mm, drive sprocket and roller simplex chain by new for pc-1b at pch-i.
Read moreEchp-i- fixing the new en-24 shaft of an new 4 wheel assembly of pc-1a/1b at pch-i
Echp-i- fixing the new en-24 shaft of an new 4 wheel assembly of pc-1a/1b at pch-i
Read moreSupply of new flow divider for receiving chute of pc 1a and 1b at pch i
Supply of new flow divider for receiving chute of pc 1a and 1b at pch i
Read moreEchp-ii- replacement of worn out/ damaged conveyor belt to a length of 22 mtrs. each of 1800mm bw in belt feeder rbfd-1a 1b at jt-20
Echp-ii- replacement of worn out/ damaged conveyor belt to a length&#x0d of 22 mtrs. each of 1800mm bw in belt feeder rbfd-1a 1b at jt-20
Read moreEchp-ii- replacement of worn out/ damaged conveyor belt to a length of 22 mtrs. each of 1800mm bw in belt feeder rbfd-1a 1b at jt-20.
Echp-ii- replacement of worn out/ damaged conveyor belt to a length of 22 mtrs. each of 1800mm bw in belt feeder rbfd-1a 1b at jt-20.
Read moreTtps- ichp- replacing the worn out bearings at both ends of stacker-i ii machine bend pulley bottom.
Ttps- ichp- replacing the worn out bearings at both ends of stacker-i ii machine bend pulley bottom.
Read moreEchp-ii- reconditioning of various size of impact idler rollers at conveyors-69,70,71,72,73,48a b,rbfd-1a 1b at echp-ii division
Echp-ii- reconditioning of various size of impact idler rollers at conveyors-69,70,71,72,73,48a b,rbfd-1a 1b at echp-ii division
Read moreof your Industry type