Tender Details
Particulars | Details |
---|---|
Title |
Echp I Replacing The Existing Worn Out Support Wheel Assembly By New Support Wheel Assembly For Pc 1 B At Pch I.
|
Description |
Echp I Replacing The Existing Worn Out Support Wheel Assembly By New Support Wheel Assembly For Pc 1 B At Pch I.
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_532449_1 |
Reference Number |
CE/SE/MI/TTPS/186/2024-2025 |
Tender Fee | 0 |
EMD | 1900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=633758 |
Start Date | March 14, 2025 17:30 |
End Date |
28/03/2025 ( Expired 25 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Read moreSurvey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Survey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Read more01/ee/trichy-i/01/nit/se(trichy)/cpwd/2025-26
Construction of 3 lakh litres capacity oht with staging height between 20 to 30 m, 5 lakh litres ug sump along with connection pipe lines between existing sump to new sump distribution lines between oht to opal hostels for nit at trichy.
Read moreRepairing of base assembly of 24/96 gaurav dragline by changing of worn out and damaged plates by new plates of sizes (20mm to 25mm).
Repairing of base assembly of 24/96 gaurav dragline by changing of worn out and damaged plates by new plates of sizes (20mm to 25mm).
Read moreS.i.t.c. of flood light system for guru nanak stadium ludhiana for lux level e avg 1400 lux (horizontal), 750 (vertical) at football field by replacing existing 2kw mh flood light fixtures with 1550-1650 watt led sports lights for live telecast
S.i.t.c. of flood light system for guru nanak stadium ludhiana for lux level e avg 1400 lux (horizontal), 750 (vertical) at football field by replacing existing 2kw mh flood light fixtures with 1550-1650 watt led sports lights for live telecast
Read moreSupply, dismantling erection testing and commissioning of existing hydraulic rail clamp assembly for thyssenkrupp make stacker cum reclaimer of conveyor 8a installed at 4x210 mw chp i at sgtps, mppgcl, birsinghpur
Supply, dismantling erection testing and commissioning of existing hydraulic rail clamp assembly for thyssenkrupp make stacker cum reclaimer of conveyor 8a installed at 4x210 mw chp i at sgtps, mppgcl, birsinghpur
Read moreRoad restoration at road no.43 cut by djb for road cutting permission for replacement of left out portion of pitampura and north-west main from haiderpur wtp-i to mu block pitampura ugr and oht pushpanjali enclave road under sub-division nwr-24 ....
Road restoration at road no.43 cut by djb for road cutting permission for replacement of left out portion of pitampura and north-west main from haiderpur wtp-i to mu block pitampura ugr and oht pushpanjali enclave road under sub-division nwr-24 ....
Read moreReconstruction of building for office with khadi plaza by demolishing existing structure at do kvic at varanasi on design, engineering ,procurement and construction on epc mode-i basis.
Reconstruction of building for office with khadi plaza by demolishing existing structure at do kvic at varanasi on design, engineering,procurement and construction (epc mode-i) basis.
Read moreRestoring renewing and replacing of the faulty parts of the existing siemens make fire alarm system along with annual maintenance comprehensive for the same at new raj bhavan capital complex agartala tripura west for the year 2025 26
Restoring renewing and replacing of the faulty parts of the existing siemens make fire alarm system along with annual maintenance comprehensive for the same at new raj bhavan capital complex agartala tripura west for the year 2025 26
Read moreRoad restoration at road no.43 cut by djb for road cutting permission for replacement of left out portion of pitampura and north-west main from haiderpur wtp-i to mu block pitampura ugr and oht pushpanjali enclave road under sub-division nwr-24 .....
Road restoration at road no.43 cut by djb for road cutting permission for replacement of left out portion of pitampura and north-west main from haiderpur wtp-i to mu block pitampura ugr and oht pushpanjali enclave road under sub-division nwr-24 ....
Read moreof your Industry type